logo
pppinindia.gov.in

public private partnership in india

List of Infrastructure Projects – Status Wise

List of Infrastructure Projects – Status Wise

This Report provides information on all infrastructure projects in the database across pre-defined set of parameters and following coverage criteria:
Export to Excel

Government Infrastructure Projects (PPP) that were either under 'Pre-construction Stage', 'Under Construction' or 'Operation and Maintenance Stage' as on April 1, 2011 or 'Awarded' thereafter and with Project Cost >INR 5 crore.

Government Infrastructure Projects (Traditional Procurement) that were under 'Pre-construction Stage', or 'Under Construction' as on April 1, 2012 or 'Awarded' thereafter and with Project Cost >INR 50 crore; and

Private Sector Projects that were under 'Pre-construction Stage', or 'Under Construction' as on April 1, 2012 or 'Awarded' thereafter and with Project Cost >INR 50 crore.

  • No. of Projects in this Report: 9242
  • Total Project Cost(in Rs Crore): 6813008.32
Sr No. Project Name Project Capacity Total Project Cost (In Rs.Crore) Sector Sub-Sector Status Project Authority Date Of Award Location Update Date
1 Establishment of 20 MW DG power plant at Bambooflat, South Andaman District # 20 74.96 Energy Electricity generation (grid) Completed Andaman and Nicobar Administration 20 Nov 1997 Andaman & Nicobar Islands (UT) 25 Oct 2019
2 Solar Photovoltaic Power (Andaman & Nicobar) Project 5 52.09 Energy Renewable energy (grid) Completed NTPC Limited 12 Dec 2011 Andaman & Nicobar Islands (UT) 27 Sep 2015
3 Transmission Line (Rajapuram) Project 76 97.82 Energy Electricity transmission Completed Transmission Corporation of Andhra Pradesh Limited 21 Jul 2014 Andhra Pradesh 05 Jan 2016
4 Transmission Line (Yemmiganur-Uravakonda) Project 102.5 125.84 Energy Electricity transmission Completed Transmission Corporation of Andhra Pradesh Limited 16 Dec 2013 Andhra Pradesh 18 Aug 2016
5 Setting up of 26 MW captive coal based power unit at Gondiparla in Kurnool district 26 208.00 Energy Electricity generation (grid) Completed Sree Rayalaseema Alkalies & Allied Chemicals Limited 01 Dec 2010 Andhra Pradesh 20 Dec 2016
6 Simhadri Coal Based Power Project - Stage II 1000 5,401.17 Energy Electricity generation (grid) Completed NTPC Limited 30 Mar 2007 Andhra Pradesh 22 Jun 2019
7 Gooty-Pullampet DL Railway Line 151 689.00 Transport Railway track, tunnel, viaducts, bridges Completed Rail Vikas Nigam Limited 07 Jul 2006 Andhra Pradesh 16 Aug 2019
8 8 Combined Cycle Power (West Godavari) Project Phase I 100 858.00 Energy Electricity generation (grid) Completed Panduranga Energy Systems Private Limited 18 Dec 2010 Andhra Pradesh 06 Jun 2019
9 Four laning of Narketpally-Addanki-Medarametla Road Project 212.5 1,760.53 Transport Roads and bridges Operation and Maintenance Stage Andhra Pradesh Road Development Corporation 23 Jul 2010 Andhra Pradesh 20 Nov 2019
10 Upgradation Penchalakona-Yerpedu road in length of 83.6 km in Anantapur district 84 361.30 Transport Roads and bridges Completed Roads and Buildings Department, Andhra Pradesh 19 May 2014 Andhra Pradesh 06 Mar 2017
11 Road Upgradation (Chittoor-Puttur) Project 60.8 112.12 Transport Roads and bridges Completed Andhra Pradesh Road Development Corporation 09 Sep 2009 Andhra Pradesh 27 Sep 2015
12 Four laning of Tadipatri-Bhaogasamudram road in length of 67.3 Km in Anantapur district 67.3 325.00 Transport Roads and bridges Completed Andhra Pradesh Road Development Corporation 09 Jan 2012 Andhra Pradesh 09 Dec 2016
13 Mechanism of Coal Handling facilities and upgradation of General Cargo Berth at Outer Harbour of Visakhapatnam Port 10.18 640.40 Transport Ports (excluding captive) Operation and Maintenance Stage Ministry of Shipping 10 Jun 2010 Andhra Pradesh 04 Dec 2019
14 Establishment of Container Terminal and O & M of handling equipment at multipurpose berth, Visakhapatnam Port 0 108.00 Transport Ports (excluding captive) Operation and Maintenance Stage Visakhapatnam Port Trust 11 Sep 2002 Andhra Pradesh 01 Oct 2019
15 Setting up of 600 MW Kameng hydel power unit at West Kameng# 600 5,269.00 Energy Renewable energy (grid) Under Construction North Eastern Electric Power Corporation Limited 08 Apr 2004 Arunachal Pradesh 04 Dec 2019
16 Four laning of Itanagar to Holongi section road in length of 19.3 Km of NH-52A (New NH-415) 19.3 536.70 Transport Roads and bridges Completed Public Works Department, Arunachal Pradesh 15 Aug 2011 Arunachal Pradesh 04 Dec 2019
17 Transmission Line (Mariani-Namrup) Project 146.05 55.75 Energy Electricity transmission Completed Assam Electricity Grid Corporation Limited 20 Jul 2012 Assam 15 Mar 2016
18 Laying of Bogibeel rail-cum-road bridge over Brahmaputra river 76 5,920.00 Transport Railway track, tunnel, viaducts, bridges Completed Northeast Frontier Railway 30 Apr 2008 Assam 04 Dec 2019
19 Road Upgradation of 135 km including construction of paved shoulder and spot raising on NH-52 135 135.80 Transport Roads and bridges Completed Public Works Department, Assam 01 Aug 2012 Assam 04 Dec 2019
20 Road Upgradation (Silchar-Balachera) Project - Phase II [AS-01] 25.7 302.75 Transport Roads and bridges Completed National Highways Authority of India (NHAI) 17 Sep 2004 Assam 04 Jul 2016
21 Operation and maintaenance of organic agriculture produces market complex at Sixmile, Khanapara, Guwahati on PPP mode 1.4 7.70 Social and Commercial Infrastructure Post-harvest storage infrastructure for agriculture and horticulture produce including cold storage Operation and Maintenance Stage Assam State Agricultural Marketing Board 29 Apr 2015 Assam 19 Aug 2019
22 Two laning of Shivganj-Baidrabad road of SH-68 in length of 83.1 km 83.1 174.32 Transport Roads and bridges Completed Bihar State Road Development Corporation Limited 15 Jul 2009 Bihar 04 Dec 2019
23 Two laning of Dumaria-Ranitalab road of SH-69 in length of 154.2 km 154.2 318.75 Transport Roads and bridges Completed Bihar State Road Development Corporation Limited 30 Dec 2008 Bihar 04 Dec 2019
24 Setting up a 1320 MW Barh super thermal based power unit stage-II at Barh in Patna 1320 10,071.50 Energy Electricity generation (grid) Completed NTPC Limited 31 Mar 2008 Bihar 24 Mar 2017
25 Setting up of 5 MW solar photovoltaic power unit in Gopalganj 5 50.00 Energy Renewable energy (grid) Completed Claro Energy Private Limited 30 Jan 2015 Bihar 16 Aug 2019
26 Setting up of 5 MW solar photovoltaic power unit in Khagaria 5 50.00 Energy Renewable energy (grid) Completed Claro Energy Private Limited 30 Jan 2015 Bihar 16 Aug 2019
27 Road Upgradation (Kameshwarnagar-Ramchandrapur-Lurgi) Project 48 51.17 Transport Roads and bridges Completed Public Works Department, Chhattisgarh 24 May 2010 Chhattisgarh 06 Sep 2016
28 High Level Bridge (Surajgarh) Project 1.3 56.16 Transport Roads and bridges Completed Public Works Department, Chhattisgarh 03 Oct 2008 Chhattisgarh 17 Nov 2015
29 Marwa Tendubhata Coal Based Power Project 1000 8,500.00 Energy Electricity generation (grid) Completed Chhattisgarh State Power Generation Company Limited 31 Dec 2008 Chhattisgarh 07 Aug 2016
30 Sipat Coal Based Power Project - Stage I 1980 9,031.22 Energy Electricity generation (grid) Completed NTPC Limited 30 Apr 2004 Chhattisgarh 27 Sep 2015
31 Elevated Corridor (Vikaspuri-Meera Bagh) Project 4.3 464.23 Transport Roads and bridges Completed Public Works Department, Delhi 22 Feb 2013 Delhi (UT) 18 Aug 2016
32 Road Corridor (Mangolpuri-Madhuban Chowk) Project 3.9 300.00 Transport Roads and bridges Completed Public Works Department, Delhi 10 Apr 2013 Delhi (UT) 31 Mar 2016
33 Road Corridor (Madhuban Chowk-Mukarba Chowk) Project 3.8 300.00 Transport Roads and bridges Completed Public Works Department, Delhi 10 Apr 2013 Delhi (UT) 31 Mar 2016
34 Integrated Terminal Building (Goa) 4 380.10 Transport Airports Completed Airports Authority of India (AAI) 06 May 2010 Goa 03 Nov 2016
35 Implementation of 70 MLD sewage treatment plant in Jamnagar district 70 78.00 Water Sanitation Sewage collection, treatment and disposal system Operation and Maintenance Stage Jamnagar Municipal Corporation 08 Oct 2013 Gujarat 27 Mar 2019
36 Water Supply Scheme (Dhanki-Ratanpar) NC-34 60 352.82 Water Sanitation Water supply pipeline Completed Gujarat Water Infrastructure Limited 07 Feb 2012 Gujarat 03 Oct 2016
37 Setting up of 400 kV Veloda substation at Sankhari# 400 89.78 Energy Electricity transmission Completed Gujarat Energy Transmission Corporation Limited 16 Aug 2013 Gujarat 04 Dec 2019
38 Ukai Coal Based Power Project - Unit No. 6 500 3,044.57 Energy Electricity generation (grid) Completed Gujarat State Electricity Corporation Limited 07 Sep 2007 Gujarat 30 Nov 2015
39 Sikka Coal Based Power Project - Unit No. 3 & 4 500 3,179.51 Energy Completed Gujarat State Electricity Corporation Limited 10 Apr 2007 Gujarat 30 Nov 2015
40 BRTS Corridor (Anuvrat Dwar-Kharwar Nagar Junction) Project 4.5 97.54 Transport Urban public transport (except rolling stock) Completed Surat Municipal Corporation 18 Sep 2012 Gujarat 31 Mar 2016
41 6 laning of Ahmedabad Vadodara Section of NH 8 and improvement of Ahmedabad Vadodara Expressway in Gujarat under NHDP Phase V 102.3 4,880.00 Transport Roads and bridges Operation and Maintenance Stage National Highways Authority of India (NHAI) 25 Jul 2011 Gujarat 09 Nov 2019
42 Four-laning of Ahmedabad – Viramgam - Maliya road 180 1,397.00 Transport Roads and bridges Operation and Maintenance Stage Gujarat State Road Development Corporation Limited (GSRDC) 17 Sep 2008 Gujarat 17 Jul 2019
43 Four Laning of Halol-Godhra-Shamlaji Road 173 1,422.00 Transport Roads and bridges Operation and Maintenance Stage Gujarat State Road Development Corporation Limited (GSRDC) 17 Sep 2008 Gujarat 17 Jul 2019
44 R-O-B (Gondal Road & Mavdi Road) Project 1.2 51.09 Transport Roads and bridges Completed Rajkot Municipal Corporation 03 Nov 2008 Gujarat 01 Jun 2016
45 Four-laning of Rajkot-Jamnagar-Vadinar road 131.7 1,096.00 Transport Roads and bridges Operation and Maintenance Stage Gujarat State Road Development Corporation Limited (GSRDC) 17 Sep 2008 Gujarat 17 Jul 2019
46 Grade Separator (Thaltej & Gurudwara) Project 1.45 60.02 Transport Roads and bridges Completed Roads and Buildings Department, Gujarat 25 Sep 2012 Gujarat 06 Mar 2017
47 Biomass Based Power (Mohindergarh) Project 9.9 64.00 Energy Renewable energy (grid) Completed Haryana Renewable Energy Development Agency 20 Feb 2007 Haryana 27 Sep 2015
48 Setting up of 10 MW solar photovoltaic based power unit at Panipat Thermal power station 10 60.55 Energy Renewable energy (grid) Completed Haryana Power Generation Corporation Limited 30 May 2016 Haryana 26 Mar 2017
49 Setting up a 1500 MW coal based power unit at Jhajjar 1500 10,131.00 Energy Electricity generation (grid) Completed Haryana Power Generation Corporation Limited 05 Jul 2007 Haryana 24 Mar 2017
50 Water Supply Scheme (Kaushalya Dam) 45 207.32 Water Sanitation Water supply pipeline Completed Haryana Urban Development Authority 18 Mar 2008 Haryana 04 Dec 2019
51 HVPNL 400 KV Jhajjar Power Transmission Project in Haryana on DBFOT basis 400 444.00 Energy Electricity transmission Operation and Maintenance Stage Haryana Vidyut Prasaran Nigam Limited 27 May 2010 Haryana 17 Jul 2019
52 Gurgaon Metro South Extension (RMGSL) project 12 2,150.00 Transport Urban public transport (except rolling stock) Operation and Maintenance Stage Haryana Urban Development Authority 01 Oct 2012 Haryana 13 Nov 2019
53 Setting up of 9 MW Beas Kund hydel power unit in Kullu district # 9 75.84 Energy Renewable energy (grid) Operation and Maintenance Stage Directorate of Energy, Himachal Pradesh 23 Mar 2001 Himachal Pradesh 30 Oct 2019
54 Setting up of 12 MW Upper Joiner hydel power unit in Chamba district # 12 72.25 Energy Renewable energy (grid) Operation and Maintenance Stage Directorate of Energy, Himachal Pradesh 12 Jan 2005 Himachal Pradesh 30 Oct 2019
55 Setting up of 5.4 MW Sarbari-II small hydel power unit in Kullu district 5.4 46.00 Energy Renewable energy (grid) Operation and Maintenance Stage Directorate of Energy, Himachal Pradesh 15 Mar 2001 Himachal Pradesh 30 Oct 2019
56 Setting up of 14 MW Sumez hydel power unit in Shimla district # 14 92.08 Energy Renewable energy (grid) Operation and Maintenance Stage Directorate of Energy, Himachal Pradesh 12 Jan 2005 Himachal Pradesh 30 Oct 2019
57 Setting up of 24 MW Baragaon hydel power unit in Kullu district 24 174.81 Energy Renewable energy (grid) Operation and Maintenance Stage Directorate of Energy, Himachal Pradesh 06 Jun 2002 Himachal Pradesh 30 Oct 2019
58 Baspa Hydel Power Project - Stage II 300 1,629.84 Energy Renewable energy (grid) Operation and Maintenance Stage Directorate of Energy, Himachal Pradesh 23 Nov 1991 Himachal Pradesh 30 Oct 2019
59 Setting up of 192 MW Allain Duhangan hydel power unit in Kullu district # 192 2,021.00 Energy Renewable energy (grid) Operation and Maintenance Stage Directorate of Energy, Himachal Pradesh 28 Aug 1993 Himachal Pradesh 30 Oct 2019
60 Setting up of 6 MW Baner hydel power unit in Kangra district 6 54.59 Energy Renewable energy (grid) Operation and Maintenance Stage Directorate of Energy, Himachal Pradesh 29 May 2000 Himachal Pradesh 30 Oct 2019
61 Setting up of 70 MW Budhil hydel power unit in Chamba district # 70 418.80 Energy Renewable energy (grid) Operation and Maintenance Stage Directorate of Energy, Himachal Pradesh 23 Sep 2004 Himachal Pradesh 30 Oct 2019
62 Setting up of 16 MW Patikari hydel power unit in Mandi district 16 115.63 Energy Renewable energy (grid) Operation and Maintenance Stage Directorate of Energy, Himachal Pradesh 21 Jun 2000 Himachal Pradesh 30 Oct 2019
63 Setting up of 15 MW Neogal hydel power unit in Kangra district # 15 61.74 Energy Renewable energy (grid) Operation and Maintenance Stage Directorate of Energy, Himachal Pradesh 28 Aug 1993 Himachal Pradesh 30 Oct 2019
64 Setting up of 14 MW nanti hydel power unit in Shimla district # 14 66.94 Energy Renewable energy (grid) Operation and Maintenance Stage Directorate of Energy, Himachal Pradesh 12 Jan 2005 Himachal Pradesh 30 Oct 2019
65 Malana Hydel Power Project - Stage I 86 341.91 Energy Renewable energy (grid) Operation and Maintenance Stage Directorate of Energy, Himachal Pradesh 28 Aug 1993 Himachal Pradesh 30 Oct 2019
66 Setting up of 100 MW Malana II hydel power unit in Kullu district 100 981.91 Energy Renewable energy (grid) Operation and Maintenance Stage Directorate of Energy, Himachal Pradesh 27 May 2002 Himachal Pradesh 30 Oct 2019
67 Setting up of 16 MW Jongini hydel power unit in Shimla district # 16 79.06 Energy Renewable energy (grid) Operation and Maintenance Stage Directorate of Energy, Himachal Pradesh 27 Oct 2006 Himachal Pradesh 30 Oct 2019
68 Setting up of 8 MW hydel power unit at Kurmi in Shimla district # 8 68.49 Energy Renewable energy (grid) Operation and Maintenance Stage Directorate of Energy, Himachal Pradesh 19 Jun 2007 Himachal Pradesh 30 Oct 2019
69 Shah Nahar Canal Extension Project 62.7 392.85 Water Sanitation Irrigation (dams, channels, embankments, etc.) Completed Irrigation and Public Health Department, Himachal Pradesh 31 Dec 1997 Himachal Pradesh 27 Feb 2017
70 Implementation of Balh Valley medium irrigation project at Sundar Nagar in Mandi district 6869.5 103.86 Water Sanitation Irrigation (dams, channels, embankments, etc.) Completed Irrigation and Public Health Department, Himachal Pradesh 02 Dec 2004 Himachal Pradesh 27 Feb 2017
71 Koldam Thermal Power Project 800 6,289.69 Energy Electricity generation (grid) Completed NTPC Limited 31 Dec 2003 Himachal Pradesh 21 Jul 2016
72 45.8 km Road Upgradation (Una - Barsar - Bhota - Bhamla - Kalkhar - Ner Chowk) Project 45.8 141.92 Transport Roads and bridges Completed Public Works Department, Himachal Pradesh 29 Feb 2008 Himachal Pradesh 01 Nov 2016
73 Road Upgradation (Una - Barsar - Bhota - Bhamla - Kalkhar - Ner Chowk) Project 45 115.83 Transport Roads and bridges Completed Public Works Department, Himachal Pradesh 29 Feb 2008 Himachal Pradesh 01 Nov 2016
74 Widening and Strengthening of Draman-Sihunta-Chowari-Jot-Chamba-Bharmour Road from 0.00 km to 24.00 km at Draman 24 48.70 Transport Roads and bridges Completed Public Works Department, Himachal Pradesh 20 Nov 2009 Himachal Pradesh 02 Nov 2016
75 Road Upgradation (Kamarhati - Sarahan-Nahan) Project 71.7 202.66 Transport Roads and bridges Completed Public Works Department, Himachal Pradesh 26 Oct 2009 Himachal Pradesh 01 Nov 2016
76 Road Upgradation (Mehatpur-Una- Amb Road) Project 44.7 98.77 Transport Roads and bridges Completed Public Works Department, Himachal Pradesh 10 Oct 2007 Himachal Pradesh 15 Sep 2016
77 Road Upgradation (Hablipora-Qadar-Qaimh) Project 24 54.90 Transport Roads and bridges Completed Jammu and Kashmir Economic Reconstruction Agency 08 Nov 2008 Jammu & Kashmir 27 Feb 2017
78 Road Upgradation (Wanpoh-Chawalgam-Aharbal) Project 42.7 60.92 Transport Roads and bridges Completed Jammu and Kashmir Economic Reconstruction Agency 07 Jan 2008 Jammu & Kashmir 27 Feb 2017
79 Storm Water Drainage (Pohru Chowk-Chanapora Bridge) Project 9.3 50.68 Water Sanitation Storm water drainage system Completed Jammu and Kashmir Economic Reconstruction Agency 26 Dec 2007 Jammu & Kashmir 27 Feb 2017
80 etting up of 500 MW Bokaro A coal based power project in Bokaro district S500 4,138.41 Energy Electricity generation (grid) Completed Damodar Valley Corporation 16 Sep 2008 Jharkhand 16 Sep 2019
81 Road Upgradation (Medininagar NH-75) Project 59 110.18 Transport Roads and bridges Completed Department of Road Construction, Jharkhand 27 Oct 2010 Jharkhand 29 Jan 2016
82 Road Upgradation (Medininagar NH-98) Project 53.54 73.14 Transport Roads and bridges Completed Department of Road Construction, Jharkhand 27 Feb 2012 Jharkhand 01 Jul 2019
83 Road Upgradation (Medininagar NH-98) Project 53.54 73.14 Transport Roads and bridges Completed Department of Road Construction, Jharkhand 27 Feb 2012 Jharkhand 01 Jul 2019
84 Road Upgradation (Hazaribagh) Project - Phase II 46.17 72.40 Transport Roads and bridges Completed Department of Road Construction, Jharkhand 28 Feb 2011 Jharkhand 29 Jan 2016
85 Upgradation of Chandrapura-Phusro-Gomia road in length of 36.3 km in Bokaro 36.3 129.76 Transport Roads and bridges Completed State Highways Authority of Jharkhand 10 Sep 2014 Jharkhand 15 Jun 2017
86 Upgradation of various roads in length of 93.5 km in Gadag district 93.5 50.00 Transport Roads and bridges Completed Public Works, Ports and Inland Water Transport Department, Karnataka 20 Oct 2012 Karnataka 05 Mar 2017
87 Upgradation of Dharwad-Saundatti road in length of 36 km in Belgaum 36 84.40 Transport Roads and bridges Completed Public Works, Ports and Inland Water Transport Department, Karnataka 11 Mar 2011 Karnataka 25 Oct 2019
88 Upgradation of Chowdapur-Gulbarga road in length of 29.3 km in Ranga Reddy 29.3 58.46 Transport Roads and bridges Completed Public Works, Ports and Inland Water Transport Department, Karnataka 11 Mar 2011 Karnataka 20 Mar 2017
89 Improvement of Dharwad- Ramnagar Stretch 61.75 237.60 Transport Roads and bridges Operation and Maintenance Stage Karnataka Road Development Corporation Limited (KRDCL) 04 Jun 2010 Karnataka 19 Aug 2019
90 Setting up of 800 MW Yermarus thermal power station project in Raichur district. 800 12,589.00 Energy Electricity generation (grid) Completed Karnataka Power Corporation Limited 09 Apr 2010 Karnataka 04 Dec 2019
91 Coal Based Power (Ballari) Project 700 4,686.20 Energy Electricity generation (grid) Completed Karnataka Power Corporation Limited 05 Oct 2013 Karnataka 04 Dec 2019
92 Kottur-Harpanhalli-Harihar BG Railway Line Project 65 488.70 Transport Railway track, tunnel, viaducts, bridges Completed South Western Railway 18 Feb 2008 Karnataka 20 Apr 2016
93 Dharwad-Kambarganvi GC Railway Line Project 26.68 188.88 Transport Railway track, tunnel, viaducts, bridges Completed South Western Railway 22 Jan 2007 Karnataka 19 Apr 2016
94 Setting up of 10 MW ground mounted solar photovoltaic power unit at Tumkuru 10 67.98 Energy Renewable energy (grid) Completed Asian Fab Tec Limited 01 Nov 2014 Karnataka 24 Jul 2017
95 Rural Electrification (Dakshina Kannada) Project - RGGVY 620.8 87.38 Energy Electricity transmission Completed Mangalore Electricity Supply Company Limited 09 Oct 2012 Karnataka 18 Oct 2016
96 Implementation of LPG pipeline between Mangalore-Yediyur with a capacity of 3.1 MMTPA 3.1 838.08 Energy Gas pipelines Completed Hindustan Petroleum Corporation Limited 20 Nov 2012 Karnataka 20 Dec 2016
97 Rural Electrification (Bangalore) Project - R-APDRP 25 431.01 Energy Electricity transmission Completed Bangalore Electricity Supply Company Limited 11 Dec 2009 Karnataka 17 Oct 2016
98 Water Supply (Bijapur) Project - UIDSSMT 38 88.90 Water Sanitation Water supply pipeline Completed Karnataka Urban Water Supply and Drainage Board 12 Jul 2012 Karnataka 30 Nov 2015
99 Water Supply (Hungund-Ilkal-Kustagi) Project - UIDSSMT 32.32 88.00 Water Sanitation Water supply pipeline Completed Karnataka Urban Water Supply and Drainage Board 04 Feb 2009 Karnataka 03 Mar 2017
100 Bangalore International Airport Project 11.5 2,353.00 Transport Airports Operation and Maintenance Stage Airports Authority of India (AAI) 05 Jul 2004 Karnataka 03 Oct 2019