Projects recommended by the Public Private Partnership Appraisal Committee (PPPAC)
This Report provides information on all infrastructure projects in the database across pre-defined set of parameters and following coverage criteria:
Export to Excel
Filters
Sr No. | Project Name | Sponsoring Authority | Location | Sector | Sub Sector | Total Project Cost (In Rs. Crore) | PPPAC Meeting Date | Meeting Number | Approval Status |
---|---|---|---|---|---|---|---|---|---|
1 | Sx laning of Anandapuram - Pendurthi - Anakapalli section of NH 5 (New NH-16) from KM 681 to KM 731.78 alongwith fourlane connectivity to Visakhapatnam Port Road from KM 0 to KM 12.7 in Andhra Pradesh on Hybrid Annuity Mode | Ministry of Road Transport and Highways | Andhra Pradesh | Transport and Logistics | Roads | 2,355.49 | 22.09.2017 | 83nd PPPAC | Final approval |
2 | Six laning of Nidagatta-Mysore section of NH-275 from km 74.20 to km 135.304 in the state of Karnataka on Hybrid Annuity mode (Package-II) | Ministry of Road Transport and Highways | Karnataka | Transport and Logistics | Roads | 2,177.80 | 17.05.2017 | 82nd PPPAC | Final approval |
3 | Six laning of Bangalore-Nidagatta section of NH-275 from km 18 to km 74.20 in the state of Karnataka on Hybrid Annuity Mode (Package I) | Ministry of Road Transport and Highways | Karnataka | Transport and Logistics | Roads | 1,995.34 | 17.05.2017 | 82nd PPPAC | Final approval |
4 | 6 laning of Narasannapeta-Ranastalam section on NH-16 (old NH-5) from km 580.671 to km 634.861 in the state of Andhra Pradesh under NHDP Phase V on Hybrid Annuity Mode | Ministry of Road Transport and Highways | Andhra Pradesh | Transport and Logistics | Roads | 1,323.15 | 17.05.2017 | 82nd PPPAC | Final approval |
5 | Six laning of Chakeri - Allahabad section of NH 2 (from KM 483.687 KM 628.753) in the State of State of Uttar Pradesh under NHDP Phase V on Hybrid Annuity Mode | Ministry of Road Transport and Highways | Uttar Pradesh | Transport and Logistics | Roads | 1,735.20 | 14.02.2017 | 81st PPPAC | Final approval |
6 | 4 laning of Solapur - Bijapur section of NH 13 from KM 0.00 to KM 110.542 in the State of Maharashtra and Karnataka under NHDP Phase III on DBFO (Toll) basis | Ministry of Road Transport and Highways | Multi State | Transport and Logistics | Roads | 1,576.79 | 14.02.2017 | 81st PPPAC | Final approval |
7 | 4 laning of end of Pandoh bypass to Takoli section of NH 21 from KM 221.305 to 242.00 KM under NHDP IVB in the State of Himachal Pradesh on Hybrid Annuity Mode | Ministry of Road Transport and Highways | Himachal Pradesh | Transport and Logistics | Roads | 2,485.93 | 14.02.2017 | 81st PPPAC | Final approval |
8 | 4 laning with paved shoulder of Porbandar - Dwarka section of NH 8E from KM 356.766 to KM 473 in the State of Gujarat on Hybrid Annuity Mode | Ministry of Road Transport and Highways | Gujarat | Transport and Logistics | Roads | 1,463.21 | 14.02.2017 | 81st PPPAC | Final approval |
9 | Six Laning of Handia Varanasi Section of NH-2 from KM 713.146 to KM 785.544 in the State of Uttar Pradesh under NHDP Phase V on Hybrid Annuity Mode | Ministry of Road Transport and Highways | Uttar Pradesh | Transport and Logistics | Roads | 2,064.99 | 28.10.2016 | 80th PPPAC | Final approval |
10 | Construction of New Link (NH-133B) from Km. 0.000 (Km. 200.87 of Sahibganj Bypass) in Jharkhand to Km. 15.885 (Junction of NH-133B and 131A on Manihanri Bypass) and construction of Manihari Bypass from Km. 0.000 (Junction of NH-133B and 131A on Manihari Bypass) to Km. 6.000 near Naranpur of NH-131A in the State of Bihar including 4 Lane Ganga Bridge on Hybrid Annuity Mode under NH(0thers) | Ministry of Road Transport and Highways | Multi State | Transport and Logistics | Roads | 1,905.55 | 13.06.2016 | 79th PPPAC | Final approval |
11 | Four laning of Phagwara-Rupnagar of NH-344A in Punjab on Hybrid Annuity Mode (total 80.82 KM) | Ministry of Road Transport and Highways | Punjab | Transport and Logistics | Roads | 1,169.61 | 25.04.2016 | 78th PPPAC | Final approval |
12 | Construction and Upgradation of NH-131A from Km. 34.578 near Narenpur to Km. 81.000 near Purnea to 4 Lane standard in thew State of Bihar on Hybrid Annuity Model under NH(0) Funding (Package II) | Ministry of Road Transport and Highways | Bihar | Transport and Logistics | Roads | 1,160.65 | 22.03.2016 | 77th PPPAC | Final approval |
13 | Construction of New Link (NH-133B) from Km. 0.000 (Km. 200.87 of Sahibganj Bypass) in Jharkhand to Km. 15.885 (Junction of NH-133B and 131A on Manihanri Bypass) and construction of Manihari Bypass from Km. 0.000 (Junction of NH-133B and 131A on Manihari Bypass) to Km. 6.000 near Naranpur of NH-131A in the State of Bihar including 4 Lane Ganga Bridge on Hybrid Annuity Mode under NH(0) funding (Package I) | Ministry of Road Transport and Highways | Multi State | Transport and Logistics | Roads | 1,905.55 | 22.03.2016 | 77th PPPAC | Final approval |
14 | Four Laning Aurangabad to Telwadi Section of NH - 211 from Km. 290.200 to 376.000 in the State of Maharashtra under the NHDP Phase IV on DBFOT (Toll) Basis | Ministry of Road Transport and Highways | Maharashtra | Transport and Logistics | Roads | 1,252.19 | 22.03.2016 | 77th PPPAC | Final approval |
15 | Six Laning of Kharar to Ludhiana Section of NH - 95 (New NH - 05) from Kharar Km. 10+185 to Samrala Chowk Ludhiana Km. 86+199 in the State of Punjab under NHDP Phase V on Hybrid Annuity Mode | Ministry of Road Transport and Highways | Punjab | Transport and Logistics | Roads | 1,388.34 | 22.03.2016 | 77th PPPAC | Final approval |
16 | Four laning of Chikhali to Fagne Section of NH-6 from Km. 360.000 to Km. 510.000 in the State of Maharashtra on DBFOT Basis under NHDP Phase IV | Ministry of Road Transport and Highways | Maharashtra | Transport and Logistics | Roads | 2,005.02 | 02.02.2016 | 76th PPPAC | Final approval |
17 | Two Laning of proposed Shimla Bypass (Kaithalighat to Shimla Section) of NH-22 under NHDP Phase III on Hybrid Annuity Mode | Ministry of Road Transport and Highways | Himachal Pradesh | Transport and Logistics | Roads | 1,160.68 | 02.02.2016 | 76th PPPAC | Final approval |
18 | Eight/Six Laning of Delhi Meerut Expressway from Km. 8.360 to Km. 27.740 (UP Border to Dasna) oh NH-24 on Hybrid Annuity Mode (Package II) | Ministry of Road Transport and Highways | Uttar Pradesh | Transport and Logistics | Roads | 1,376.51 | 02.02.2016 | 76th PPPAC | Final approval |
19 | Four Laning of Lucknow Sultanpur Section of NH-56 on Hybrid Annuity Mode | Ministry of Road Transport and Highways | Uttar Pradesh | Transport and Logistics | Roads | 1,638.44 | 02.02.2016 | 76th PPPAC | Final approval |
20 | Final Approval for Six laning of Aurangabad to Bihar/ Jharkhand Border section of NH-2 from Km 180.00 to Km 249.320 | Ministry of Road Transport and Highways | Bihar | Transport and Logistics | Roads | 1,005.52 | 15.10.2015 | 74th PPPAC | Final approval |
21 | Final Approval for Six laning of Bihar/ Jharkhand Border (Chordaha) to Barwa Adda section of NH-2 from Km 249.320 to Km 400.132 | Ministry of Road Transport and Highways | Jharkhand | Transport and Logistics | Roads | 2,768.68 | 15.10.2015 | 74th PPPAC | Final approval |
22 | Four laning of Chikli to Fagne Section of NH-6 from Km 360.00 to Km 510.00 | Ministry of Road Transport and Highways | Maharashtra | Transport and Logistics | Roads | 1,852.50 | 10.04.2015 | 72th PPPAC | Final approval |
23 | Four laning of Cuttack-Augul section of NH-42 from km 0.000 to 112.000 in the state of Orissa under NHDP Phase IV B on BoT (Toll) basis | Ministry of Road Transport and Highways | Odisha | Transport and Logistics | Roads | 1,462.50 | 10.04.2015 | 72nd PPPAC | Final approval |
24 | Four laning of Amravati to Chikhli Section of NH-6 from Km 166.00 to Km 360.00 in the state of Maharashtra under NHDP Phase IV | Ministry of Road Transport and Highways | Maharashtra | Transport and Logistics | Roads | 2,288.18 | 10.04.2015 | 72nd PPPAC | Final approval |
25 | Four laning of fagne to Gujarat-Maharashtra Border section of NH 6 from Km 510.00 to Km 650.79 in the state of Maharashtra under NHDP Phase IV | Ministry of Road Transport and Highways | Maharashtra | Transport and Logistics | Roads | 1,885.74 | 10.04.2015 | 72nd PPPAC | Final approval |
26 | Four laning of Guna to Biaora section of NH 3 from Km 332.100 to Km 426.100 in the state of Madhya Pradesh under NHDP phase IV | Ministry of Road Transport and Highways | Madhya Pradesh | Transport and Logistics | Roads | 1,012.90 | 20.03.2015 | 71st PPPAC | Final approval |
27 | Four laning of Biora - Dewas section of NH-3 from Km 426.100 to Km 566.450 in the state of Madhya Pradesh under NHDP phase IV | Ministry of Road Transport and Highways | Madhya Pradesh | Transport and Logistics | Roads | 1,583.79 | 20.03.2015 | 71st PPPAC | Final approval |
28 | Six laning of Indore-Dewas section of NH 3 from Km 577.55 to km 610.00 and Km 0.00 to Km 12.60 in the State of MP under NHDP V on BOT basis | Ministry of Road Transport and Highways | Madhya Pradesh | Transport and Logistics | Roads | 410.00 | 21.11.2008 | 19th PPPAC | Final approval |
29 | Six laning of Agra-Etawah Section of NH 2 from Km 199/660 to km 323.525 on BoT (Toll) in the state of Uttar Pradesh under NHDP Phase V. | Ministry of Road Transport and Highways | Uttar Pradesh | Transport and Logistics | Roads | 1,650.20 | 18.02.2015 | 70th PPPAC | Final approval |
30 | Four laning of Solapur - Bijapur section of NH 13, under NHDP Phase III from km 0.000 to 110.542 in the States of Maharashtra and Karnataka on BOT (Toll) Basis | Ministry of Road Transport and Highways | Maharashtra | Transport and Logistics | Roads | 1,377.54 | 18.02.2015 | 70th PPPAC | Final approval |
31 | Eight laning of Mukarba Chowk to Panipat of NH 1 (DEL-HRY) | Ministry of Road Transport and Highways | Haryana | Transport and Logistics | Roads | 2,128.72 | 18.02.2015 | 70th PPPAC | Final approval |
32 | Four laning of Hospet-Chitradurga section of NH-13 from km 299.000 to km 418.600 in the state of Karnataka under NHDP Phase IV B on BoT (Toll) basis | Ministry of Road Transport and Highways | Karnataka | Transport and Logistics | Roads | 1,388.00 | 22.01.2015 | 69th PPPAC | Final approval |
33 | Four/six laning of Raipur-Bilaspur section of NH 200 from km 0.000 to km 127.650 in the State of Chhattisgarh under NHDP Phase IV B on BoT (Toll) basis | Ministry of Road Transport and Highways | Chhattisgarh | Transport and Logistics | Roads | 1,548.88 | 23.12.2014 | 68th PPPAC | Final approval |
34 | Six laning of Chakeri-Allahabad section of NH-2 from km 483.687 to km 630.0 under NHDP Phase-V on BOT (Toll) basis. | Ministry of Road Transport and Highways | Uttar Pradesh | Transport and Logistics | Roads | 1,661.60 | 23.12.2014 | 68th PPPAC | Final approval |
35 | Six laning of Handia- Varanasi from km 713.146 to km 785.544 under NHDP-V | Ministry of Road Transport and Highways | Uttar Pradesh | Transport and Logistics | Roads | 2,356.16 | 27.11.2014 | 67th PPPAC | Final approval |
36 | Eastern Peripheral Expressway (NH No. NE-II) | Ministry of Road Transport and Highways | Haryana | Transport and Logistics | Roads | 4,489.00 | 27.11.2014 | 67th PPPAC | Final approval |
37 | Six laning of Chandikhole - Baleshwar section of NH 5 from NH 62.00 and km 199.141 in the state of Orissa | Ministry of Road Transport and Highways | Odisha | Transport and Logistics | Roads | 2,176.71 | 27.11.2014 | 67th PPPAC | Final approval |
38 | Four laning of Nagina Kashipur Section of NH 74 from KM 71.614 to KM 170.407 under NHDP IV | Ministry of Road Transport and Highways | Multi State | Transport and Logistics | Roads | 1,099.00 | 31.07.2014 | 66th PPPAC | Final approval |
39 | Four laning of Lucknow-Sultanpur Section of NH 56 from KM 11.5 to KM 135 under NHDP IV | Ministry of Road Transport and Highways | Uttar Pradesh | Transport and Logistics | Roads | 1,276.00 | 31.07.2014 | 66th PPPAC | Final approval |
40 | Four laning of Singhara-Bhinjhabal Section of NH6 from KM 310.806 to KM 414.982 under NHDP IV | Ministry of Road Transport and Highways | Odisha | Transport and Logistics | Roads | 1,045.00 | 31.07.2014 | 66th PPPAC | Final approval |
41 | Four-laning of Chutmalpur-Ganeshpur section of NH-72A from Km 0.000 (Km 22.825 of NH-73) to Km 17.900 & Roorkee-Chutmalpur-Saharanpur-Yamunanagar (UP/Haryana Border) Section of NH-73 from Km 0.000 (Km 167.800 of NH-58) to Km 86.855in the State of Uttarakh | Ministry of Road Transport and Highways | Multi State | Transport and Logistics | Roads | 1,390.00 | 09.06.2014 | 65th PPPAC | Final approval |
42 | Four laning of Mohania - Ara section of NH -30 (KM 0.000 to KM 116.700) in the State of Bihar on DBFOT (Toll) basis | Ministry of Road Transport and Highways | Bihar | Transport and Logistics | Roads | 917.00 | 09.06.2014 | 65th PPPAC | Final approval |
43 | Four laning of Rajauli - Bakhtiyarpur section of NH -31 in the State of Bihar on DBFOT (Toll) basis | Ministry of Road Transport and Highways | Bihar | Transport and Logistics | Roads | 847.10 | 09.06.2014 | 65th PPPAC | Final approval |
44 | Four-laning a section between Yadgiri-Warangal section of NH 202 from km 54.000 to km 150.000 in the State of Andhra Pradesh under NHDP-IV on BOT (Toll) basis | Ministry of Road Transport and Highways | Andhra Pradesh | Transport and Logistics | Roads | 1,123.17 | 28.04.2014 | 64th PPPAC | Final approval |
45 | Widening and Strengthening of Bikaner - Phalodi section of NH - 15 to 4 lane from km 4.200 to km 55.250 and two lane with paved shoulder from km 55.250 ot km 163.500 under NHDP - Phase IV on BOT (Toll) mode in the state of Rajasthan | Ministry of Road Transport and Highways | Rajasthan | Transport and Logistics | Roads | 822.90 | 27.02.2014 | 63rd PPPAC | Final approval |
46 | Delhi - Meerut Expressway and other connecting roads including 6/8 laning of NH-24 from km 0.000 to km 49.23, NH-58 from km 6.800 to km52.528 and NH-235 from km 0.360 to km 8.800 on DBFOT (Toll) basis in the State of Delhi and Uttar Pradesh (Total Length) | Ministry of Road Transport and Highways | Multi State | Transport and Logistics | Roads | 6,571.01 | 27.02.2014 | 63rd PPPAC | Final approval |
47 | Four laning of Sultanpur-Varanasi Section of NH-56 from km 134.700 to km 271.300 in the State of Uttar Pradesh under NHDP - IV on DBFOT (Toll) basis. | Ministry of Road Transport and Highways | Uttar Pradesh | Transport and Logistics | Roads | 1,778.00 | 27.02.2014 | 63rd PPPAC | Final approval |
48 | Four-laning of Ghaghar Bridge (Indo Nepal Border) to Varanasi section from Km 121.800 to Km 298.450 of NH 233 in the State of Uttar Pradesh under NHDP IV on BOT (Toll) basis | Ministry of Road Transport and Highways | Uttar Pradesh | Transport and Logistics | Roads | 1,954.29 | 27.02.2014 | 63rd PPPAC | Final approval |
49 | Four laning of Zirakpur to Patiala section of NH 64 under VGF Scheme, length 50.70 km | Ministry of Road Transport and Highways | Punjab | Transport and Logistics | Roads | 536.25 | 27.02.2014 | 63rd PPPAC | Final approval |
50 | Four laning with PSS of Amritsar to Bathinda section of NH - 15 from km 103.000 to km 287.500 in the State of Punjab on BOT (Toll) basis under NHDP - IV | Ministry of Road Transport and Highways | Punjab | Transport and Logistics | Roads | 1,899.00 | 27.02.2014 | 63rd PPPAC | Final approval |
51 | Two laning with paved shoulder / Four laning of Tamil Nadu / Karnataka Border to Bangalore section of NH-209 from km 266.530 to km 458.52 in the State of Karnataka under NHDP Ph IV on DBFOT (Toll) basis | Ministry of Road Transport and Highways | Karnataka | Transport and Logistics | Roads | 693.04 | 17.01.2014 | 62nd PPPAC | Final approval |
52 | Four laning of Kazhakkuttam to Mukkola section in the State of Kerala | Ministry of Road Transport and Highways | Kerala | Transport and Logistics | Roads | 577.95 | 17.01.2014 | 62nd PPPAC | Final approval |
53 | Two laning with paved shoulder of Jabalpur - Mandala - Chilpi section from km 3/4 to km 192.400 of NH-12A in the State of Madhya Pradesh on DBFOT basis under NHDP - IV | Ministry of Road Transport and Highways | Madhya Pradesh | Transport and Logistics | Roads | 811.74 | 17.01.2014 | 62nd PPPAC | Final approval |
54 | Four laning of Ambala - Kaithal section of NH-65 including Ambala Bypass in the State of Haryana on BOT (Toll) project on DBFOT (Toll) basis under NHDP Phase II | Ministry of Road Transport and Highways | Haryana | Transport and Logistics | Roads | 878.00 | 17.01.2014 | 62nd PPPAC | Final approval |
55 | Two laning with paved shoulder from km 0.000 to km7.950 ( Katni Bypass) & km 4.600 to km 245.000 of Katni - Shahdol - Anooppur to MP/CG Border section on NH-78 in the State of Madhya Pradesh on DBFOT | Ministry of Road Transport and Highways | Madhya Pradesh | Transport and Logistics | Roads | 811.47 | 26.12.2013 | 61st PPPAC | Final approval |
56 | Four laning with paved side shoulders of a section betwwen Jharpokharia Baleshwar | Ministry of Road Transport and Highways | Odisha | Transport and Logistics | Roads | 705.88 | 31.10.2013 | 60th PPPAC | Final approval |
57 | Four laning of PSS of Sangrur - Punjab/Haryana border section of NH - 71 from km 181.805 (Sangrur) to km 238.695 (Punjab/Haryana border) in the State of Punjab on BOT (Toll) basis under NHDP - IV | Ministry of Road Transport and Highways | Punjab | Transport and Logistics | Roads | 481.59 | 05.08.2013 | 59th PPPAC | Final approval |
58 | Two laning of Zojila Tunnel of 14.083 km length on NH - 1D in the State of Jammu & Kashmir on BOT annuity basis | Ministry of Road Transport and Highways | Jammu and Kashmir | Transport and Logistics | Roads | 9,090.13 | 05.08.2013 | 59th PPPAC | Final approval |
59 | Four laining with PSS of Kaithal to Rajasthan Border section of NH 152/65 from km 33.250 to km 243.580 in the State of Haryana under NHDP IV on BOT (Toll) basis | Ministry of Road Transport and Highways | Haryana | Transport and Logistics | Roads | 1,393.00 | 21.05.2013 | 58th PPPAC | Final approval |
60 | Four laning with PSS of Aurangabad to Yedshi section on NH 211 from km 100.000 to km 290.200 in the State of Maharashtra on DBFOT pattern | Ministry of Road Transport and Highways | Maharashtra | Transport and Logistics | Roads | 1,871.34 | 21.05.2013 | 58th PPPAC | Final approval |
61 | Four laning with PSS of Solapur to Yedshi section on NH 211 from km 0.000 to km 100.000 in the State of Maharashtra on DBFOT pattern | Ministry of Road Transport and Highways | Maharashtra | Transport and Logistics | Roads | 972.50 | 21.05.2013 | 58th PPPAC | Final approval |
62 | Two /Four laning with PSS of Gadu to Dwaraka section on NH 8E from km 263.000 to km 473.000 in the State of Gujarat on DBFOT pattern | Ministry of Road Transport and Highways | Gujarat | Transport and Logistics | Roads | 1,528.72 | 21.05.2013 | 58th PPPAC | Final approval |
63 | Six/ Eight laning of JNPT Port Road Project ofn Mumbai JNPT Port Road Company Ltd. (MJPRCL) from km 3.60 to km 27.27 at NH 4B (A1 - E section), km 0.0 to km 4.492 at NH-4B (D-G section), km 5.3 to km 14. 85 on SH-54 and km 0.000 to km 6.200 on Amra Marg | Ministry of Road Transport and Highways | Maharashtra | Transport and Logistics | Roads | 1,822.00 | 21.05.2013 | 58th PPPAC | Final approval |
64 | Four laning with PSS of a section between Ghoshpukur- Falakata-Salsalabari Section of NH 31D in the state of West Bengal on BOT (Toll) basis under NHDP-II. | Ministry of Road Transport and Highways | West Bengal | Transport and Logistics | Roads | 2,212.00 | 22.02.2013 | 57th PPPAC | Final approval |
65 | Two laning with PSS a section, between Kerala Border to Kollegal section of NH-212 in the state of Karnataka on BOT (Toll) basis under NHDP-IV | Ministry of Road Transport and Highways | Karnataka | Transport and Logistics | Roads | 523.49 | 22.02.2013 | 57th PPPAC | Final approval |
66 | Four-laning of Rohtak - Hisar Section of NH-10 connecting to NH-71, in Haryana under NHDP-III on BOT (Toll) basis | Ministry of Road Transport and Highways | Haryana | Transport and Logistics | Roads | 959.25 | 21.12.2012 | 56th PPPAC | Final approval |
67 | Four-laning of Bhuban-Dubari-Chandikhole section of NH-200 in Odisha under NHDP-III on DBFOT (Toll) basis. | Ministry of Road Transport and Highways | Odisha | Transport and Logistics | Roads | 652.00 | 21.12.2012 | 56th PPPAC | Final approval |
68 | Four-Laning of Bhavnagar-Veraval Section of NH-8E in Gujarat under NHDP-IV on BOT (Toll) basis | Ministry of Road Transport and Highways | Odisha | Transport and Logistics | Roads | 2,781.96 | 21.12.2012 | 56th PPPAC | Final approval |
69 | Four-laning a section between Khed-Sinnar section of NH 50 from km 42 to km 177 in the State of Maharashtra under NHDP-IV on BOT (Toll) basis. | Ministry of Road Transport and Highways | Maharashtra | Transport and Logistics | Roads | 1,348.20 | 21.12.2012 | 56th PPPAC | Final approval |
70 | Four-laning of Rewa-Sidhi section of NH-75 E from km. 2.8 to km 83.4 in the State of Madhya Pradesh under NH (O) on DBFOT (Toll) basis | Ministry of Road Transport and Highways | Madhya Pradesh | Transport and Logistics | Roads | 627.87 | 21.12.2012 | 56th PPPAC | Final approval |
71 | Two-laning with Paved Side Shoulders of Nagaur-Jodhpur section of NH-65 from km 166.26 to km 296.07 in the State of Rajasthan under NH (O) on DBFOT (Toll) basis. | Ministry of Road Transport and Highways | Rajasthan | Transport and Logistics | Roads | 439.96 | 21.12.2012 | 56th PPPAC | Final approval |
72 | Two-laning with PSS section, between Bijapur, Gulbarga, Homnabad section of NH 218 from Km 195.000 to Km 418.000 in the State of Karnataka on BOT (Toll) | Ministry of Road Transport and Highways | Karnataka | Transport and Logistics | Roads | 680.73 | 28.09.2012 | 54th PPPAC | Final approval |
73 | Four-laning with PSS of Jabalpur-Bhopal section of NH-12 from km 10.400 to km 301.800 under NHDP Phase III on BOT (Toll) basis | Ministry of Road Transport and Highways | Madhya Pradesh | Transport and Logistics | Roads | 2,485.96 | 28.09.2012 | 54th PPPAC | Final approval |
74 | Four/Two-laning of Baharagora to Sambalpur Section from km 200.00 to 566.000 Section of NH-6 in the State of Orissa under NHDP, IV on BOT (Toll) basis | Ministry of Road Transport and Highways | Odisha | Transport and Logistics | Roads | 1,948.64 | 28.09.2012 | 54th PPPAC | Final approval |
75 | Two laning Z-Morh Tunnel section of NH-I on BOT (Annuity) in Sonamarg, Srinagar, Jammu and Kashmir | Ministry of Road Transport and Highways | Jammu and Kashmir | Transport and Logistics | Roads | 2,680.42 | 16.07.2012 | 53rd PPPAC | Final approval |
76 | Four-laning of Kashipur-Sitarganj Section of NH-74 from km 175.000 to km 252.200 in the States of Uttarakhand and Uttar Pradesh under NHDP V B on BOT (Toll) basis | Ministry of Road Transport and Highways | Multi State | Transport and Logistics | Roads | 605.85 | 16.07.2012 | 53rd PPPAC | Final approval |
77 | Four-laning of a section under NHDP-IV, between Hubli - Hospet section of NH 63 from km 129+249 to km 267+000 in the State of Karnataka on BOT (Toll) basis. | Ministry of Road Transport and Highways | Karnataka | Transport and Logistics | Roads | 1,293.19 | 16.07.2012 | 53rd PPPAC | Final approval |
78 | Four-laning of Rajsamand-Bhilwara section of NH-(78, 79 & 8) from km 0.000 to km 87.250 in the State of Rajasthan under NHDP IV on BOT (Toll) basis. | Ministry of Road Transport and Highways | Rajasthan | Transport and Logistics | Roads | 677.79 | 16.07.2012 | 53rd PPPAC | Final approval |
79 | Two-laning with PSS of Salasar to Haryana border, section of NH-65 from km 154.141 to km 0 and capacity augmentation in 2021 for four laning in the State of Rajasthan under NHDP IV on BOT (Toll) basis | Ministry of Road Transport and Highways | Rajasthan | Transport and Logistics | Roads | 530.07 | 16.07.2012 | 53rd PPPAC | Final approval |
80 | Four-laning with PSS of Jodhpur-Pali section of NH-65 (from km 308.0 to km 366.0) and Pali bypass starting from km 366.0of NH-65 to km 114 of NH-14 in the State of Rajasthan under NH (O) on DBFOT (Toll) basis | Ministry of Road Transport and Highways | Rajasthan | Transport and Logistics | Roads | 332.70 | 16.07.2012 | 53rd PPPAC | Final approval |
81 | Four laning of Goa/Karnataka Boarder to Kundapur section of NH - 17 from km 93.700 to km 283.300 in the state of Karnataka under NHDP -IV pm DBFOT (Toll) | Ministry of Road Transport and Highways | Karnataka | Transport and Logistics | Roads | 1,655.01 | 09.03.2012 | 51st PPPAC | Final approval |
82 | Six-laning of Aurangabad-Barwa Adda Section of NH-2 from Km 180.000 to 398.750 in the State of Bihar and Jharkhand under NHDP Phase-V on BOT (Toll) basis. | Ministry of Road Transport and Highways | Multi State | Transport and Logistics | Roads | 2,340.00 | 09.03.2012 | 51st PPPAC | Final approval |
83 | Six laning of Anandapuram-Visakhapatnam-Anakapalli section of NH-5 from Km 682.98 to Km 741.200 in the State of Andhra Pradesh under NHDP Phase-V on BOT (Toll) basis. | Ministry of Road Transport and Highways | Andhra Pradesh | Transport and Logistics | Roads | 839.00 | 09.03.2012 | 51st PPPAC | Final approval |
84 | Six laning (including Construction of additional 4 lane Bridge across River Narmada) of Vadodara-Surat Section of NH-8 from 192.000 to Km 198.000 in the State of Gujarat under NHDP Phase-V on BOT (Toll) basis. | Ministry of Road Transport and Highways | Gujarat | Transport and Logistics | Roads | 473.24 | 09.03.2012 | 51st PPPAC | Final approval |
85 | Four laning of Coimbatore-Mettupalayam Section of NH-67 from Km 323/850 to Km 377/780 in the State of Tamil Nadu under NHDP Phase-III on BOT (Toll) basis. | Ministry of Road Transport and Highways | Tamil Nadu | Transport and Logistics | Roads | 592.00 | 09.03.2012 | 51st PPPAC | Final approval |
86 | Four laning of Haryana/Punjab Border to Jind Section of NH-71 from Km 239.000 to Km 307.000 in the State of Haryana under NHDP Phase-III on BOT (Toll) basis. | Ministry of Road Transport and Highways | Haryana | Transport and Logistics | Roads | 438.75 | 09.03.2012 | 51st PPPAC | Final approval |
87 | Six-laning of Gundugolanu - Rajahmundry section of NH-5 from km 1022.494 to km 901.753 in the State of Andhra Pradesh under NHDP Phase V on BOT (Toll) basis. | Ministry of Road Transport and Highways | Andhra Pradesh | Transport and Logistics | Roads | 1,617.00 | 17.02.2012 | 50th PPPAC | Final approval |
88 | Four laning of Hoskate-Dabespet Section on NH-207 in the State of Karnataka under NHDP Phase IV on DBFOT (Toll) basis | Ministry of Road Transport and Highways | Karnataka | Transport and Logistics | Roads | 720.69 | 17.02.2012 | 50th PPPAC | Final approval |
89 | Patiala-Sangrur-Barnala-Bathinda section of NH-64 from Km. 50.000 to Km. 209.500 in the state of Punjab (DBFOT) basis under NHDP-IV. | Ministry of Road Transport and Highways | Punjab | Transport and Logistics | Roads | 1,586.35 | 17.02.2012 | 50th PPPAC | Final approval |
90 | Two laning with paved shoulders of Raibarelly-Jaunpur Section of NH-231 from Km 0.000 to Km 166.4 in the state of Uttar Pradesh under NHDP - IV on BoT (Annuity) basis. | Ministry of Road Transport and Highways | Uttar Pradesh | Transport and Logistics | Roads | 569.36 | 17.02.2012 | 50th PPPAC | Final approval |
91 | Two laning with paved shoulders of Nagaur-Bikaner section of NH-89 from km 171/00 to km 267/325 of NH 89 (including bypass at Nagaur from km 180/500 of NH-65 to km 171/00 of NH-89) in the state of Rajasthan under NH (Others) with implementation of the pro | Ministry of Road Transport and Highways | Rajasthan | Transport and Logistics | Roads | 378.07 | 17.02.2012 | 50th PPPAC | Final approval |
92 | Chandikole - Paradeep Section, km 0.000 to 76.618 of NH - 5A under NHDP V on BOT (Toll) | Ministry of Road Transport and Highways | Odisha | Transport and Logistics | Roads | 1,014.36 | 23.01.2012 | 49th PPPAC | Final approval |
93 | Four laning of Chandikhole - Dubari - Talchar Secton of NH 200, km 301.89 to km 428.03 including km 8.500 to km 15,.75 in the State of Orissa | Ministry of Road Transport and Highways | Odisha | Transport and Logistics | Roads | 1,273.00 | 13.12.2011 | 48th PPPAC | Final approval |
94 | Four laining of Gomti - Chauraha - Udaipur Section of NH - 8 , km 177.000 to km 260. 10 under NHDP - IV A on BOT (Toll) Basis | Ministry of Road Transport and Highways | Rajasthan | Transport and Logistics | Roads | 942.95 | 13.12.2011 | 48th PPPAC | Final approval |
95 | Two / Four laing of Vikravandi to Meensuruti Section of NH - 45C from km 0 .000 to km 93.500 and two laning with PSS from Meensuruti, km 93.500 to Thanjavur km 164.614 in the State of Tamil Nadu under NHDP - IV on BOT (Toll) Basis. | Ministry of Road Transport and Highways | Tamil Nadu | Transport and Logistics | Roads | 1,090.00 | 13.12.2011 | 48th PPPAC | Final approval |
96 | Two / Four laning of section between Madurai to Ramanathapuram from km 5.000 to km 79. 340 and two lane with paved shoulders from km 79.340 to km 118.795 of NH 49 in Tamil Nadu under NHDP Phase III on BOT (Toll) Basis. | Ministry of Road Transport and Highways | Tamil Nadu | Transport and Logistics | Roads | 683.00 | 13.12.2011 | 48th PPPAC | Final approval |
97 | Two / Fourl laning with paved shoulders of Sikar - Bikaner Section of NH - 11 (km 340.188 to km 557. 775 via Sikar By - Pass) and Bikaner Bypass (km 553. 869 of NH-11 to km 267.325 of NH-89) in the State of Rajasthan under National Highways (Others) on | Ministry of Road Transport and Highways | Rajasthan | Transport and Logistics | Roads | 627.54 | 13.12.2011 | 48th PPPAC | Final approval |
98 | Four laning with paved shoulders of Sinnnar - Nashik Section of NH-50 (km 177 to 201.35 in the state of Maharashtra under National Highways (Others) on BOT (Toll) Basis | Ministry of Road Transport and Highways | Maharashtra | Transport and Logistics | Roads | 312.96 | 13.12.2011 | 48th PPPAC | Final approval |
99 | Construction of new bridges and operation and maintenance of four-laned road of the Baleshwar-Kharagpur section of NH-60 from km 0.00 to km 119.30 on BOT (Toll) basis | Ministry of Road Transport and Highways | Bihar | Transport and Logistics | Roads | 480.38 | 11.11.2011 | 47th PPPAC | Final approval |
100 | Six-laning of Vijayawada-Gundugolanu section of NH-5 section from km 1076.48.00 to km 1022.48 under NHDP Phase V on BOT (Toll) basis: | Ministry of Road Transport and Highways | Andhra Pradesh | Transport and Logistics | Roads | 1,684.00 | 11.11.2011 | 47th PPPAC | Final approval |
101 | Four-laning Kiratpur- Ner Chowk Section from Km 73.20 to Km 186.50 of NH-21 in the State of Himachal Pradesh under NHDP-III on BOT (Toll) basis: | Ministry of Road Transport and Highways | Himachal Pradesh | Transport and Logistics | Roads | 1,818.47 | 11.11.2011 | 47th PPPAC | Final approval |
102 | Four-laning a section of the National Highway 73, between 4 Laning of Panchkula, Yamunanagar section from Km 71.640 to Km 179.285 in the State of Haryana under NHDP-III on BOT (Toll) basis: | Ministry of Road Transport and Highways | Haryana | Transport and Logistics | Roads | 934.93 | 11.11.2011 | 47th PPPAC | Final approval |
103 | Four laning of Rampur-Kathgodam section of NH-87 from km 0.000 to km 88.000 in the state of Uttar Pradesh and Uttarakhand under NHDP Phase-III on BoT (Toll) basis | Ministry of Road Transport and Highways | Uttar Pradesh | Transport and Logistics | Roads | 790.00 | 14.09.2011 | 46th PPPAC | Final approval |
104 | Four laning of Maharashtra/Karnataka Border to Sangareddy Section of NH 9 from Km 348/800 to km 423/800 on BoT (Toll) in the state of Karnataka and Andhra Pradesh under NHDP Phase IVB | Ministry of Road Transport and Highways | Andhra Pradesh | Transport and Logistics | Roads | 1,273.30 | 14.09.2011 | 46th PPPAC | Final approval |
105 | Four laning of Solapur-Maharashtra/Karnataka Border section of NH-19 from km 249.000 to km 348.800 in the State of Maharashtra under NHDP Phase IV B on BoT (Toll) basis. | Ministry of Road Transport and Highways | Maharashtra | Transport and Logistics | Roads | 923.04 | 14.09.2011 | 46th PPPAC | Final approval |
106 | Four laning of sections from km 277.500 to km 333.500 (Mahullia to Bahragora) of NH 33 and from km 200.55 to km 134.40 (Bahragora to Kharagpur) of NH 6 in the State of Jharkhand and West Bengal under NHDP Phase IVB on DBFOT (Toll) basis | Ministry of Road Transport and Highways | Multi State | Transport and Logistics | Roads | 940.00 | 14.09.2011 | 46th PPPAC | Final approval |
107 | Four laning of Lucknow Raebarelly Section of NH-24 B from km 12.700 to km 82.700 on BoT (Annuity) under NHDP Phase-IV B in the State of U.P. | Ministry of Road Transport and Highways | Uttar Pradesh | Transport and Logistics | Roads | 635.90 | 14.09.2011 | 46th PPPAC | Final approval |
108 | Six laning of Etawah Chakeri (Kanpur) section of NH 2 under NHDP Phase V, length 160.21 km | Ministry of Road Transport and Highways | Uttar Pradesh | Transport and Logistics | Roads | 1,573.00 | 14.09.2011 | 46th PPPAC | Final approval |
109 | Four Laning of Vijaywada-Machilipatnam section of NH 9 under NHDP Phase III, length 64.611 km | Ministry of Road Transport and Highways | Andhra Pradesh | Transport and Logistics | Roads | 606.00 | 10.08.2011 | 45th PPPAC | Final approval |
110 | Two/ four laning of Obedullaganj -Shahganj Junction, Budhni- Betul Section of NH 69 under NHDP-IV, length 121.36 km | Ministry of Road Transport and Highways | Madhya Pradesh | Transport and Logistics | Roads | 1,152.00 | 10.08.2011 | 45th PPPAC | Final approval |
111 | Two laning of Ajmer to Nagaur section on NH 89 under VGF Scheme, length 148.25 km | Ministry of Road Transport and Highways | Rajasthan | Transport and Logistics | Roads | 377.15 | 10.08.2011 | 45th PPPAC | Final approval |
112 | Two laningof Bikaner to Suratgarh section on NH 11 under VGF Scheme, length 172.384 km | Ministry of Road Transport and Highways | Rajasthan | Transport and Logistics | Roads | 501.08 | 10.08.2011 | 45th PPPAC | Final approval |
113 | Two laning of Chittorgarh-Neemach section of NH 79 and Nimbahera-Pratapgarh section of NH 113 under VGF Scheme, length 116.997 km | Ministry of Road Transport and Highways | Madhya Pradesh | Transport and Logistics | Roads | 511.21 | 10.08.2011 | 45th PPPAC | Final approval |
114 | Two laning of Suratgarh-Sriganganagar section of NH 15 under VGF Scheme, length 78.10 km | Ministry of Road Transport and Highways | Rajasthan | Transport and Logistics | Roads | 224.03 | 10.08.2011 | 45th PPPAC | Final approval |
115 | Four laning of Mangwan to MP/UP border section of NH 27 under VGF Scheme, length 52.074 km | Ministry of Road Transport and Highways | Madhya Pradesh | Transport and Logistics | Roads | 381.66 | 10.08.2011 | 45th PPPAC | Final approval |
116 | Four laning of Sidhi to Singrauli section of NH 75E under VGF Scheme, length 102.60 km | Ministry of Road Transport and Highways | Madhya Pradesh | Transport and Logistics | Roads | 871.15 | 10.08.2011 | 45th PPPAC | Final approval |
117 | Four laning of Mangwan to Satna to Bela section of NH 75 under VGF Scheme, length 48.04 km | Ministry of Road Transport and Highways | Madhya Pradesh | Transport and Logistics | Roads | 320.48 | 10.08.2011 | 45th PPPAC | Final approval |
118 | Six laning of Kishangarh -Udaipur- Ahmedabad section of NH 79A, NH79, NH 76 and NH 8 under NHDP Phase V, length 555.50 km | Ministry of Road Transport and Highways | Rajasthan | Transport and Logistics | Roads | 5,387.30 | 20.06.2011 | 44th PPPAC | Final approval |
119 | Four laning of Lucknow -Sultanpur section of NH 56 under NHDP Phase IV, length 123.40 km | Ministry of Road Transport and Highways | Uttar Pradesh | Transport and Logistics | Roads | 1,013.00 | 20.06.2011 | 44th PPPAC | Final approval |
120 | Four laning of Angul-Sambalpur section of NH 42 under NHDP Phase IV, length 153 km | Ministry of Road Transport and Highways | Odisha | Transport and Logistics | Roads | 1,220.32 | 20.06.2011 | 44th PPPAC | Final approval |
121 | Two/four laning of Birmitrapur to Barkote section of NH 23 under NHDP Phase IV, length 125.615 km | Ministry of Road Transport and Highways | Odisha | Transport and Logistics | Roads | 778.15 | 20.06.2011 | 44th PPPAC | Final approval |
122 | Four laning of Bhopal to Biaora section of NH 12 under VGF scheme, length 105.60 km | Ministry of Road Transport and Highways | Madhya Pradesh | Transport and Logistics | Roads | 704.26 | 20.06.2011 | 44th PPPAC | Final approval |
123 | Four laning of Rewa to MP/UP Border of NH 7 under VGF scheme, length 89.30 km | Ministry of Road Transport and Highways | Madhya Pradesh | Transport and Logistics | Roads | 670.82 | 20.06.2011 | 44th PPPAC | Final approval |
124 | Four-Laning of Hospet, Bellary Section of NH-63 under NHDP Phase IV, length 95.44 km | Ministry of Road Transport and Highways | Karnataka | Transport and Logistics | Roads | 910.08 | 20.05.2011 | 43rd PPPAC | Final approval |
125 | Four Laning of Walayar to Vadakkancherry Section (Package No.NS-2/BOT/KL-2) | Ministry of Road Transport and Highways | Kerala | Transport and Logistics | Roads | 682.00 | 20.05.2011 | 43rd PPPAC | Final approval |
126 | Four-laning of Jabalpur- Kanti- Rewa Section of NH-7 from km 242.30 to km 465.50 in the State of Madhya Pradesh under NHDP Phase IV on BOT (Toll) | Ministry of Road Transport and Highways | Madhya Pradesh | Transport and Logistics | Roads | 1,906.83 | 19.04.2011 | 42nd PPPAC | Final approval |
127 | Four -laning of Orrisa border to Aurang section of NH-6 from km 88.0 to km 239.0 in the St6ate of Chattisgarh under Phase IV B on DBFOT (Toll) basis | Ministry of Road Transport and Highways | Chhattisgarh | Transport and Logistics | Roads | 1,234.00 | 19.04.2011 | 42nd PPPAC | Final approval |
128 | Four-laning of Meerut, Bulandshahar section of NH-235 from km 7.469 to km 73.156 in the State of Uttar Pradesh under NHDP Phase IV B on DBFOT (Toll) basis: TPC ` 505.0 crore. | Ministry of Road Transport and Highways | Uttar Pradesh | Transport and Logistics | Roads | 505.00 | 19.04.2011 | 42nd PPPAC | Final approval |
129 | Four laning of Jabalpur - Lakhandone section of NH7 from km 465.600 to km 546.425 in the State fo Madhaya Pradesh under NHDP Phase IVB on BOT (Too) basis | Ministry of Road Transport and Highways | Madhya Pradesh | Transport and Logistics | Roads | 776.76 | 25.01.2011 | 41st PPPAC | Final approval |
130 | Four laning of Gwalior - Shivpuri section of NH 3 from km 15.600 to NH 75 to km 236.000 in the State of Madhya Pradesh under NHDP Phase IV on BOT (Toll) basis. | Ministry of Road Transport and Highways | Madhya Pradesh | Transport and Logistics | Roads | 1,059.00 | 25.01.2011 | 41st PPPAC | Final approval |
131 | Four laning of Shivpuri - Dewas section of NH3 from km 15.623 to km 566.45 in the State of Madhya Pradesh under NHDP Phase IV on BOT (Toll) basis. | Ministry of Road Transport and Highways | Madhya Pradesh | Transport and Logistics | Roads | 2,815.00 | 25.01.2011 | 41st PPPAC | Final approval |
132 | Six laning of Ahmedabad Vadodara Section of NH 8 from km 6.400 to km 108.700 and improvement of Ahmedabad Vadodara Expressway from km 0 to km 93.302 in the State of Gujarat under NHDP Phase V on BOT(Toll) basis | Ministry of Road Transport and Highways | Gujarat | Transport and Logistics | Roads | 2,125.24 | 06.01.2011 | 40th PPPAC | Final approval |
133 | Two/Four laning of NH 12 from km 256.550 to km 346.539 (Kota-Jhalwar section) in the State of Rajasthan under NHDP Phase III on BOT(Toll) basis basis | Ministry of Road Transport and Highways | Rajasthan | Transport and Logistics | Roads | 530.01 | 06.01.2011 | 40th PPPAC | Final approval |
134 | Four laning of Beawar Pali Pindwara Section of NH 14 from km 0 to km 244.120 in the State of Rajasthan under NHDP Phase III on BOT(Toll) basis | Ministry of Road Transport and Highways | Rajasthan | Transport and Logistics | Roads | 2,388.00 | 06.01.2011 | 40th PPPAC | Final approval |
135 | Four laning of Nagpur Wainganga Bridge Section of NH 6 from km 498 to km 544.200 in the State of Maharashtra under NHDP Phase III on BOT(Toll) basis | Ministry of Road Transport and Highways | Maharashtra | Transport and Logistics | Roads | 484.19 | 06.01.2011 | 40th PPPAC | Final approval |
136 | Six laning of Poonamallee-Walajapet section of NH 4 under NHDP V on BOT(Toll) basis | Ministry of Road Transport and Highways | Tamil Nadu | Transport and Logistics | Roads | 1,197.00 | 02.12.2010 | 39th PPPAC | Final approval |
137 | Four Laning of Panikoili-Rimuli Section of NH 215 under NHDP Phase III, length 163 km | Ministry of Road Transport and Highways | Odisha | Transport and Logistics | Roads | 1,410.00 | 17.08.2010 | 38th PPPAC | Final approval |
138 | Six laning of Barwa-Adda-Panagarh section of NH 2 in the State of Jharkhand and West Bengal under NHDP PhaseV on BOT (Toll) basis | Ministry of Road Transport and Highways | West Bengal | Transport and Logistics | Roads | 1,714.00 | 17.08.2011 | 38th PPPAC | Final approval |
139 | Parwanoo-Solan section of NH 22 in the State of Himachal Pradesh on BOT (Annuity) under NHDP Phase III | Ministry of Road Transport and Highways | Himachal Pradesh | Transport and Logistics | Roads | 659.65 | 17.08.2010 | 38th PPPAC | Final approval |
140 | Four laning of Barasat-Krishnagar section of NH 34 in the State of West Bengal under NHDP Phase III on BOT (Annuity) basis | Ministry of Road Transport and Highways | West Bengal | Transport and Logistics | Roads | 886.73 | 17.08.2010 | 38th PPPAC | Final approval |
141 | Two laning of Purnea-Khagaria section of NH 31 in the State of Bihar under NHDP Phase III on BOT (Annuity) basis | Ministry of Road Transport and Highways | Bihar | Transport and Logistics | Roads | 676.00 | 17.08.2010 | 38th PPPAC | Final approval |
142 | Four laning of Ranchi Jamshedpur section of NH33 in the State of Bihar on BoT (Annuity) under NHDP Phase III | Ministry of Road Transport and Highways | Bihar | Transport and Logistics | Roads | 1,479.00 | 28.05.2010 | 36th PPPAC | Final approval |
143 | Four laning of Krishnanagar-Baharampur section of NH 34 from Km 115 to km 193 in the State of West Bengal | Ministry of Road Transport and Highways | West Bengal | Transport and Logistics | Roads | 708.26 | 28.04.2010 | 35th PPPAC | Final approval |
144 | Two laning with paved shoulders of Jhansi-Khajuraho section of NH 75 from km 1.900 to km 169.950 in the State of UP and MP under NHDP III on BOT (Toll) basis | Ministry of Road Transport and Highways | Multi State | Transport and Logistics | Roads | 494.00 | 28.04.2010 | 35th PPPAC | Final approval |
145 | Four laning of Ludhiana-Talwandi section of NH 95 from km 92 to km 170 in the State of Punjab under BOT (Toll) NHDP III on DBFOT | Ministry of Road Transport and Highways | Punjab | Transport and Logistics | Roads | 479.00 | 28.04.2010 | 35th PPPAC | Final approval |
146 | Four laning of Jetput - Somnath Section of NH 80 in the State of Gujarat | Ministry of Road Transport and Highways | Gujarat | Transport and Logistics | Roads | 828.00 | 28.04.2010 | 35th PPPAC | Final approval |
147 | Four/Six laning of Panvel Indapur section of NH 17 in the State of Maharashtra | Ministry of Road Transport and Highways | Maharashtra | Transport and Logistics | Roads | 942.70 | 28.04.2010 | 35th PPPAC | Final approval |
148 | Two laning with paved shoulder of Muzaffarpur Sanbarsa section of NH 77 in the State of Bihar | Ministry of Road Transport and Highways | Bihar | Transport and Logistics | Roads | 511.54 | 28.04.2010 | 35th PPPAC | Final approval |
149 | Two laning with paved shoulder of Tindivam Krishnagiri section of NH 66 from km 38.150 to km 214 in the state of Tamil Nadu | Ministry of Road Transport and Highways | Tamil Nadu | Transport and Logistics | Roads | 828.26 | 15.03.2010 | 34th PPPAC | Final approval |
150 | Four laning of Nagpur Saoner Pandhurna Betul section of NH 69 from km 3.000 to km 59.300 in the state of Maharashtra and km 137.000 to km 257.400 in the state of MP on BOT (Annuity) basis | Ministry of Road Transport and Highways | Maharashtra | Transport and Logistics | Roads | 2,519.62 | 15.03.2010 | 34th PPPAC | Final approval |
151 | Two laning with paved shoulder from Kozhikode - Muthanga section of NH 212 in Kerala | Ministry of Road Transport and Highways | Kerala | Transport and Logistics | Roads | 365.23 | 22.02.2010 | 32th PPPAC | Final approval |
152 | Six laning of NH7 from Hosur to Krishnagiri on NH93 in Tamil Nadu | Ministry of Road Transport and Highways | Tamil Nadu | Transport and Logistics | Roads | 535.00 | 22.02.2010 | 32th PPPAC | Final approval |
153 | Six laning of Dankuni - Baleshwar section of NH 6 in West Bengal | Ministry of Road Transport and Highways | West Bengal | Transport and Logistics | Roads | 2,034.40 | 22.02.2010 | 32th PPPAC | Final approval |
154 | Four laning of Chapra - Hazipur section on NH 19 in Bihar | Ministry of Road Transport and Highways | Bihar | Transport and Logistics | Roads | 691.00 | 22.02.2010 | 32th PPPAC | Final approval |
155 | Four laning of Bhubaneshwar - Puri section of NH 203 in Orissa | Ministry of Road Transport and Highways | Odisha | Transport and Logistics | Roads | 500.29 | 22.02.2010 | 32th PPPAC | Final approval |
156 | Four laning of Karnataka/Kerala border - Kannur section in Kerala | Ministry of Road Transport and Highways | Kerala | Transport and Logistics | Roads | 1,157.16 | 22.02.2010 | 32th PPPAC | Final approval |
157 | Four laning of Sambalpur Baragarh of Orissa/Chhatisgarh border section of NH 6 from Km 0 to Km 88 in Orissa | Ministry of Road Transport and Highways | Odisha | Transport and Logistics | Roads | 909.00 | 22.02.2010 | 32th PPPAC | Final approval |
158 | Two laning with paved shoulder of Dindigul - Theni and Theni - Kumili in Tamil Nadu under NHDP III | Ministry of Road Transport and Highways | Tamil Nadu | Transport and Logistics | Roads | 501.00 | 22.02.2010 | 32th PPPAC | Final approval |
159 | Four laning of Barhi to Hazaribagh section of NH 33 in Jharkhand | Ministry of Road Transport and Highways | Jharkhand | Transport and Logistics | Roads | 414.00 | 22.02.2010 | 32th PPPAC | Final approval |
160 | Four/Six lanning of Patna - Bakhtiyarpur section from Km 176.60 to Km 230 of NH 30 in the State of Bihar | Ministry of Road Transport and Highways | Bihar | Transport and Logistics | Roads | 600.54 | 10.02.2010 | 31th PPPAC | Final approval |
161 | Two laning with Pave shoulder from Varanasi to Gorakhpur section Km 2 to Km 208 of NH 29 in the State of UP | Ministry of Road Transport and Highways | Uttar Pradesh | Transport and Logistics | Roads | 538.88 | 10.02.2010 | 31th PPPAC | Final approval |
162 | Two laning with pave shoulder from Aligarh to Kanpur from Km 140.100 to Km 418.760 on NH 91 in the State of UP | Ministry of Road Transport and Highways | Uttar Pradesh | Transport and Logistics | Roads | 723.25 | 10.02.2010 | 31th PPPAC | Final approval |
163 | Two laning with pave shoulder from Bilaspur - Urdawal section Km 3116 to Km 312.400 of 4 on NH 200 | Ministry of Road Transport and Highways | Chhattisgarh | Transport and Logistics | Roads | 494.00 | 10.02.2010 | 31th PPPAC | Final approval |
164 | Two laning with pave shoulder on Raigarh - Saraipalli from 3.800 to Km 90.460 on NH 216 in the State of Chattisgarh | Ministry of Road Transport and Highways | Chhattisgarh | Transport and Logistics | Roads | 189.19 | 10.02.2010 | 31th PPPAC | Final approval |
165 | Two laning of Deali - Kota section of NH 12 on Kota bypass in Rajasthan | Ministry of Road Transport and Highways | Rajasthan | Transport and Logistics | Roads | 593.38 | 10.02.2010 | 31th PPPAC | Final approval |
166 | Srinagar to banihal section of NH 1A from km 187 to km 189.350, km 270.700 to km 286.110 and 187 to 220.700 on DBFOT (Annuity) in the State of Jammu and Kashmir | Ministry of Road Transport and Highways | Jammu and Kashmir | Transport and Logistics | Roads | 1,166.00 | 16.11.2009 | 28th PPPAC | Final approval |
167 | Six laning of NH 4 from Tumkur to Chitradurga in Karnataka under NHDP Phase V on BOT (Toll) on DBFO pattern | Ministry of Road Transport and Highways | Karnataka | Transport and Logistics | Roads | 839.00 | 16.10.2009 | 28th PPPAC | Final approval |
168 | Four laning of Qazigund to Banihal Section of NH 1A from km 189.350 to km 204.700 including 2 tunnels of 0.69 km and km 8.45 length on BOT (Annuity) basis in the State of Jammu and Kashmir | Ministry of Road Transport and Highways | Jammu and Kashmir | Transport and Logistics | Roads | 1,987.00 | 16.10.2009 | 28th PPPAC | Final approval |
169 | Rehabilitation , strengthening and Four laning of Ramban to Banihal section of NH 1A from km 151 to km 187 on BOT (Annuity) basis on DBFO pattern in the state of Jammu and Kashmir | Ministry of Road Transport and Highways | Jammu and Kashmir | Transport and Logistics | Roads | 986.00 | 16.10.2009 | 28th PPPAC | Final approval |
170 | Rehabilitation, strengthening and Four laning of Udhampur to Ramban section of NH 1A from km 67 to km 89 & km 130 to km 151 in the state of JUammu and Kashmir | Ministry of Road Transport and Highways | Jammu and Kashmir | Transport and Logistics | Roads | 971.00 | 16.10.2009 | 28th PPPAC | Final approval |
171 | Four laning of Chenani to Nashri section of NH 1A from km 89 to km 130 including 9 km long tunnel with parallel escape tunnel on BOT (Annuity) basis of Jammu & Kashmir | Ministry of Road Transport and Highways | Jammu and Kashmir | Transport and Logistics | Roads | 2,108.00 | 16.10.2009 | 28th PPPAC | Final approval |
172 | Rehabilitation strengthening and 4 laning of Jammu-Udhampur section of NH 1A from Km 15 to km 67 on BOT (Annuity) basis on DBFO pattern in the State of Jammu & Kashmir | Ministry of Road Transport and Highways | Jammu and Kashmir | Transport and Logistics | Roads | 1,939.00 | 16.10.2009 | 28th PPPAC | Final approval |
173 | Six laning of Chenagapjalli to Start of Coimbatore bypass section 1 and four laning from end of Coimbatore bypass to TN/Kerala Boarder of NH 47 in the State of Tamil Nadu | Ministry of Road Transport and Highways | Tamil Nadu | Transport and Logistics | Roads | 852.74 | 27.07.2009 | 26th PPPAC | Final approval |
174 | Design, Engineering, Upgradation, Development, Finance, Operation and Maintenance of Hyderabad-Bangalore section of NH 7 in the state of 12 under NHDP Phase VII | Ministry of Road Transport and Highways | Karnataka | Transport and Logistics | Roads | 747.30 | 27.07.2009 | 26th PPPAC | Final approval |
175 | Design, Engineering, Finance, Construction, Operation and Maintenance of four laning of Bijapur-Hungund section of NH 13 from km 102 to km 202 in the State of Karnataka under NHDP Phase III through DBFOT basis | Ministry of Road Transport and Highways | Karnataka | Transport and Logistics | Roads | 694.60 | 27.07.2009 | 26th PPPAC | Final approval |
176 | Design, Engineering, Finance, Construction, Operation and Maintenance of four laning of Bijapur-Hungund section of NH 13 from km 202 to km 299 in the State of Karnataka under NHDP Phase III through DBFOT basis | Ministry of Road Transport and Highways | Karnataka | Transport and Logistics | Roads | 1,226.37 | 27.07.2009 | 26th PPPAC | Final approval |
177 | Four laning of Raiganj-Dalkhola section of NH 34 from km 398 to km 452.700 in the state of West Bangal on DBFOT basis under NHDP III | Ministry of Road Transport and Highways | West Bengal | Transport and Logistics | Roads | 560.16 | 27.07.2009 | 26th PPPAC | Final approval |
178 | Four laning of Baharampur-Farakka section of NH 34 from km 193 to km 295.700 in the state of West Bengal on DBFOT basis under NHDP III | Ministry of Road Transport and Highways | West Bengal | Transport and Logistics | Roads | 1,006.53 | 27.07.2009 | 26th PPPAC | Final approval |
179 | Four laning of Rohtak to Panipat section of NH 71A from km 0 to km 80.858 in the state of Haryana on BOT basis under NHDP III | Ministry of Road Transport and Highways | Haryana | Transport and Logistics | Roads | 1,087.93 | 27.07.2009 | 26th PPPAC | Final approval |
180 | Four/Six laning of Moradabad-Bareilly section of NH 24 from km 1+C28348 to km 262 in the state of Uttar Pradesh on DBFOT basis under NHDP III | Ministry of Road Transport and Highways | Uttar Pradesh | Transport and Logistics | Roads | 1,484.93 | 27.07.2009 | 26th PPPAC | Final approval |
181 | Four laning of Muzaffarnagar-Haridwar section of NH 58 from km 131 to 211 of NH 58 in the state of UP and Uttarakhand | Ministry of Road Transport and Highways | Multi State | Transport and Logistics | Roads | 804.00 | 27.07.2009 | 26th PPPAC | Final approval |
182 | Four laning of Farakka-Raiganj section of NH 34 from km 295 to km 398 in the State of West Bengal on DBFOT basis under NHDP III | Ministry of Road Transport and Highways | West Bengal | Transport and Logistics | Roads | 1,056.56 | 27.07.2009 | 26th PPPAC | Final approval |
183 | Four/Six laning of Maharashtra/Goa Border Km 475.040 to Panaji-Goa/Karnataka Border km 611 of section NH 17 in the state of Goa to be executed as BOT (Toll) on DBFO pattern under NHDP Phase III | Ministry of Road Transport and Highways | Goa | Transport and Logistics | Roads | 2,078.00 | 09.07.2009 | 25th PPPAC | Final approval |
184 | Six laning of Pune-Satara section of NH 4 from km 725 to km 865.35 in the State of Maharashtra under NHDP Phase V on BOT (Toll) basis on DBFO pattern | Ministry of Road Transport and Highways | Maharashtra | Transport and Logistics | Roads | 1,724.55 | 09.07.2009 | 25th PPPAC | Final approval |
185 | Six laning of Samakhiali-Gandhidham section of NH 8A from km 306 to km 362.16 in the State of Gujarat under NHDP Phase V on BOT (Toll) basis on DBFO pattern | Ministry of Road Transport and Highways | Gujarat | Transport and Logistics | Roads | 805.39 | 09.07.2009 | 25th PPPAC | Final approval |
186 | Four/Six laning of Gandhidham-Mundra Port section of NH8A in the State of Gujarat under NHDP Phase III on DBFOT pattern | Ministry of Road Transport and Highways | Gujarat | Transport and Logistics | Roads | 1,031.14 | 09.07.2009 | 25th PPPAC | Final approval |
187 | Four laning of Ahmedabad to Godhra section of NH 59 in the State of Gujarat under NHDP Phase III on DBFOT pattern | Ministry of Road Transport and Highways | Gujarat | Transport and Logistics | Roads | 1,174.36 | 09.07.2009 | 25th PPPAC | Final approval |
188 | Four laning of Godhara to Gujarat/MP border section of NH 59 in the State of Gujarat under NHDP Phase III on DBFOT pattern | Ministry of Road Transport and Highways | Gujarat | Transport and Logistics | Roads | 855.55 | 09.07.2009 | 25th PPPAC | Final approval |
189 | Four laning of Indore-Jhabua-Gujarat/MP border section of NH 59 in the state of Madhya Pradesh on BOT (Toll) basis under NHDP III | Ministry of Road Transport and Highways | Madhya Pradesh | Transport and Logistics | Roads | 1,297.00 | 09.07.2009 | 25th PPPAC | Final approval |
190 | Four laning of Rohtak to Bawal Section of NH 71 in the state of Haryana on DBFOT basis under NHDP III | Ministry of Road Transport and Highways | Haryana | Transport and Logistics | Roads | 669.00 | 09.07.2009 | 25th PPPAC | Final approval |
191 | Four laning of Haridwar-Dehradun Section of NH 58 & 72 in the state of Uttarakhand-BOT(Annuity) basis | Ministry of Road Transport and Highways | Uttarakhand | Transport and Logistics | Roads | 490.00 | 09.07.2009 | 25th PPPAC | Final approval |
192 | Four laning of Bareilly-Sitapur section of NH 24 in the State of Uttar Pradesh on BOT basis under NHDP III | Ministry of Road Transport and Highways | Uttar Pradesh | Transport and Logistics | Roads | 1,046.00 | 09.07.2009 | 25th PPPAC | Final approval |
193 | Four laning of Hyderabad-Yadgiri section of NH 202 in the State of Andhra Pradesh under NHDP Phase III on BOT basis | Ministry of Road Transport and Highways | Andhra Pradesh | Transport and Logistics | Roads | 514.91 | 09.07.2009 | 25th PPPAC | Final approval |
194 | Four laning of Talegaon - Amravati section of NH 6 in Maharashtra on DBFOT basis | Ministry of Road Transport and Highways | Maharashtra | Transport and Logistics | Roads | 610.59 | 20.02.2009 | 23th PPPAC | Final approval |
195 | Four laning of Pune -Sholapur section (km 144.00 to 249.00) of NH9 in the State of Maharashtra under NHDP III A on BOT (Toll) basis - Package II | Ministry of Road Transport and Highways | Maharashtra | Transport and Logistics | Roads | 809.85 | 20.02.2009 | 23th PPPAC | Final approval |
196 | Four Laning of Trivandrum, Kerala/ Tamil Nadu border including Trivandrum by-pass (Package I) | Ministry of Road Transport and Highways | Kerala | Transport and Logistics | Roads | 822.41 | 31.12.2008 | 20th PPPAC | Final approval |
197 | Four Laning of Kerala/ Tamil Nadu border, Kanyakumari section of NH 47 (Package II) | Ministry of Road Transport and Highways | Tamil Nadu | Transport and Logistics | Roads | 851.05 | 31.12.2008 | 20th PPPAC | Final approval |
198 | Four laning of Patna-Muzaffarpur stretch of NH 77from Km 0 to Km 46.30 and construction of Muzzafarpur bypass for connection to NH 28 in the Satae of Bihar. under NHDP Phase III on BOT(Annuity) Basis | Ministry of Road Transport and Highways | Bihar | Transport and Logistics | Roads | 570.06 | 31.12.2008 | 20th PPPAC | Final approval |
199 | Four laning of Hazaribagh-Ranchi stretch of NH 33 from Km 40.500 to Km114.000 including Kujju bypass in the Satae of Jharkhand. under NHDP Phase IIIA on BOT(Annuity) Basis | Ministry of Road Transport and Highways | Jharkhand | Transport and Logistics | Roads | 594.75 | 31.12.2008 | 20th PPPAC | Final approval |
200 | Four laning of Nagapatnam-Thanjavur section of NH 67 from km 1.600 to km 80.00 in the state of Tamil Nadu under NHDP Phase IIIA on BOT (Toll) basis | Ministry of Road Transport and Highways | Tamil Nadu | Transport and Logistics | Roads | 619.00 | 21.12.2008 | 19th PPPAC | Final approval |
201 | Four/Six Laning of Gujarat/Maharashtra Border-Surat-Hazira Port Section of NH 6 in the State of Gujarat under NHDP Phase III on BOT (Toll) basis | Ministry of Road Transport and Highways | Gujarat | Transport and Logistics | Roads | 1,509.10 | 21.11.2008 | 19th PPPAC | Final approval |
202 | Four laning of Cherthalai-Ochira section of NH-47 (Package I) from Km 379.100(Thiruvoor Jn) to Km 465.00 (Ochira) in the State of Kerala under NHDP III on BOT basis. | Ministry of Road Transport and Highways | Kerala | Transport and Logistics | Roads | 1,286.80 | 21.11.2008 | 19th PPPAC | Final approval |
203 | Four laning of Ochira-Thiruvananthapuram section of NH-47 (Package II) from Km 465.000 (Ochira) to Km 551.900 (Kazakuttam jn) in the State of Kerala under NHDP III on BOT basis | Ministry of Road Transport and Highways | Kerala | Transport and Logistics | Roads | 1,240.79 | 21.11.2008 | 19th PPPAC | Final approval |
204 | Four laning of Vengalam-Kuttipuram section of NH-17 (Package II) from Km 230.00 to Km 318 in the State of Kerala under NHDP III on BOT basis | Ministry of Road Transport and Highways | Kerala | Transport and Logistics | Roads | 1,108.47 | 21.11.2008 | 19th PPPAC | Final approval |
205 | Four laning of Kannur-Vengalam section of NH-17 (Package I) from Km 148.00 to Km 230 in the State of Kerala under NHDP III on BOT basis | Ministry of Road Transport and Highways | Kerala | Transport and Logistics | Roads | 1,143.66 | 21.11.2008 | 19th PPPAC | Final approval |
206 | Development of Six laning of Chilkaluripet-Nellore section of NH 5 from km 1182.802 to km 1366.547 in the State of Andhra Pradesh under NHDP Phase V on BOT (Toll) project on DBFO pattern | Ministry of Road Transport and Highways | Andhra Pradesh | Transport and Logistics | Roads | 2,163.90 | 21.11.2008 | 19th PPPAC | Final approval |
207 | Four/Six Laning of Jaipur-Tonk-Deoli section of NH 12 from km 18.7 to km 165 (length 148.77 kms) in the State of Rajasthan under NHDP Phase III on BOT (Toll) basis | Ministry of Road Transport and Highways | Rajasthan | Transport and Logistics | Roads | 1,183.60 | 21.11.2008 | 19th PPPAC | Final approval |
208 | Six laning of Delhi-Agra section of NH 2 from Km 20.500 to Km 199.600 in the States of Haryana/UP under NHDP V on BOT basis | Ministry of Road Transport and Highways | Multi State | Transport and Logistics | Roads | 1,917.63 | 21.11.2008 | 19th PPPAC | Final approval |
209 | Six laning of Belgaum-Dharwad section of NH 4 from Km 515 to km 433 and Km 0 to Km62 in the State of Karnatakaunder NHDP V on BOT basis | Ministry of Road Transport and Highways | Karnataka | Transport and Logistics | Roads | 637.50 | 21.11.2008 | 19th PPPAC | Final approval |
210 | Six laning of Chandikol-Jagatpur-Bhubhaneshwar section of NH 5 from Km 413 to 418 and Km 0 to Km 62 in the State of Orissa under NHDP V on BOT basis | Ministry of Road Transport and Highways | Odisha | Transport and Logistics | Roads | 951.38 | 21.11.2008 | 19th PPPAC | Final approval |
211 | Six laning of Krishnagiri-Walahjpet section of NH 46 from Km 0 to km 148.30 in the State of Tamil Nadu under NHDP V on BOT basis | Ministry of Road Transport and Highways | Tamil Nadu | Transport and Logistics | Roads | 1,489.55 | 21.11.2008 | 19th PPPAC | Final approval |
212 | Six laning of Varanasi-Aurangabad section of NH 2from Km 786.00 to km 978.40 in the State of UP/Bihar under NHDP V on BOT basis | Ministry of Road Transport and Highways | Multi State | Transport and Logistics | Roads | 2,588.38 | 21.11.2008 | 19th PPPAC | Final approval |
213 | Four laning of Khagaria-Bhaktiarpur section of NH31 in the state of Bihar | Ministry of Road Transport and Highways | Bihar | Transport and Logistics | Roads | 1,703.82 | 04.08.2008 | 16th PPPAC | Final approval |
214 | Four laning of Kuttipuram-Edapally section of NH17 in the state of Kerala | Ministry of Road Transport and Highways | Kerala | Transport and Logistics | Roads | 1,157.92 | 04.08.2008 | 16th PPPAC | Final approval |
215 | Four laning of Patna-Buxar section of NH 30 in the state of Bihar | Ministry of Road Transport and Highways | Bihar | Transport and Logistics | Roads | 1,619.83 | 04.08.2008 | 16th PPPAC | Final approval |
216 | Four laning of Goa/Karnataka border-Panaji, Goa stretch of NH 4A of Goa | Ministry of Road Transport and Highways | Goa | Transport and Logistics | Roads | 382.46 | 04.08.2008 | 16th PPPAC | Final approval |
217 | Four laning of MP/Maharashtra border-Nagpur section of NH7 including Kamptee-Kahnan and Nagpur bypass in the State of Maharashtra | Ministry of Road Transport and Highways | Maharashtra | Transport and Logistics | Roads | 1,133.84 | 04.08.2008 | 16th PPPAC | Final approval |
218 | Four laning elevated road from Chennai Port gate No. 10 to Maduravoyal (NH 4) in the state of Tamil nadu | Ministry of Road Transport and Highways | Tamil Nadu | Transport and Logistics | Roads | 1,345.14 | 04.08.2008 | 16th PPPAC | Final approval |
219 | Four laning of Armur-Adloor Yellareddy section of NH7 in the State of Andhra Pradesh | Ministry of Road Transport and Highways | Andhra Pradesh | Transport and Logistics | Roads | 490.50 | 04.08.2008 | 16th PPPAC | Final approval |
220 | Four laning of Muzzafarnagar-Nepali farm section of NH 58 in the State of Uttar Pradesh and Uttrakhand from Nepali to ISBT Dehradun | Ministry of Road Transport and Highways | Uttar Pradesh | Transport and Logistics | Roads | 1,251.42 | 04.08.2008 | 16th PPPAC | Final approval |
221 | Four laning of Pune-Sholapur section of NH 9 under NHDP Phase III, length 110.05 km Package II | Ministry of Road Transport and Highways | Maharashtra | Transport and Logistics | Roads | 1,110.00 | 04.08.2008 | 16th PPPAC | Final approval |
222 | Four laning of Cuddapah-Kurnool section (Km 167.750 to km 356.030) of NH 18 Under NHDP Phase III on BOT Basis | Ministry of Road Transport and Highways | Andhra Pradesh | Transport and Logistics | Roads | 1,567.31 | 17.06.2008 | 15th PPPAC | Final approval |
223 | Four laning of Jorhat-Demow section from Km 453 to 534.8 (part of Nagaon-Dirbugah section) of NH 37 in the State of Assam under SARDP-NE Phase A on BOT (Annuity) basis | Ministry of Road Transport and Highways | Assam | Transport and Logistics | Roads | 562.00 | 30.04.2008 | 14th PPPAC | Final approval |
224 | Four/Six laning of Ghaziabad-Aligarh section of NH 91under NHDP Phase III on BOT Basis. | Ministry of Road Transport and Highways | Uttar Pradesh | Transport and Logistics | Roads | 1,325.30 | 30.04.2008 | 14th PPPAC | Final approval |
225 | Four/Six laning of Amritsar-Pathankot Section from KM 6.082 to KM 108.502 of NH 15 Under NHDP Phase III on BOT Basis | Ministry of Road Transport and Highways | Punjab | Transport and Logistics | Roads | 704.15 | 30.04.2008 | 14th PPPAC | Final approval |
226 | Six Laning of Kishangarh-Ajmer-Beawar Section from KM 364.125 to KM 58.245 of NH 8 on BOT Basis | Ministry of Road Transport and Highways | Rajasthan | Transport and Logistics | Roads | 722.24 | 30.04.2008 | 14th PPPAC | Final approval |
227 | Four laning of Trichy Karaikkudi section of NH-210 (km 10.000 to km 94.000) and Trichy Bypass (ch 109.558 to ch 135.390) in the State of Tamil Nadu under NHDP Phase III on BOT basis. | Ministry of Road Transport and Highways | Tamil Nadu | Transport and Logistics | Roads | 804.04 | 30.04.2008 | 14th PPPAC | Final approval |
228 | Four laning of Karaikkudi-Ramanathapuram section of NH-210 (101 kms)in the State of Tamil Nadu under NHDP Phase III on BOT basis. | Ministry of Road Transport and Highways | Tamil Nadu | Transport and Logistics | Roads | 599.41 | 30.04.2008 | 14th PPPAC | Final approval |
229 | Four laning of Baihata Chariali to Tejpur Section of NH-52 (Km 0.00 to km 130.00) in the State of Assam under NHDP Phase III on BOT basis. | Ministry of Road Transport and Highways | Assam | Transport and Logistics | Roads | 1,203.67 | 30.04.2008 | 14th PPPAC | Final approval |
230 | Four laning of Tirupati-Tiruthani-Chennai section of NH 205 from km 274.800 to km 341.600 in Andhra Pradesh and km 0 to 59.60 in Tamil Nadu Under NHDP Phase III on BOT Basis | Ministry of Road Transport and Highways | Andhra Pradesh | Transport and Logistics | Roads | 801.80 | 30.04.2008 | 14th PPPAC | Final approval |
231 | Four laning of Kundapur to Suratkal section ( Km 284 to 358) and Mangalore-Kerala border section (km 375.300 to 376.700 and from Km3.700 to 17.200) of NH 17 Under NHDP Phase III on BOT Basis | Ministry of Road Transport and Highways | Karnataka | Transport and Logistics | Roads | 616.00 | 30.04.2008 | 14th PPPAC | Final approval |
232 | Four Laning of Rimuli Roxy Rajamunda Section of NH 215 from Km 163 to Km 269 in the State of Orissa under NHDP Phase IIIA on BOT Basis. | Ministry of Road Transport and Highways | Odisha | Transport and Logistics | Roads | 654.00 | 05.11.2007 | 13th PPPAC | Final approval |
233 | Design Construction, Finance, Operation and maintenance of Hyderabad-Vijayawada section including Design, Engineering Finance, Consttruction of additional Two Laning/future Six Laning of NH 9 in the State of Andhra Pradesh (km 40 to km 160) | Ministry of Road Transport and Highways | Andhra Pradesh | Transport and Logistics | Roads | 968.00 | 05.11.2007 | 13th PPPAC | Final approval |
234 | Design Construction, Finance, Operation and maintenance of Hyderabad-Vijayawada section including Design, Engineering Finance, Construction of additional Two Laning/future Six Laning of NH 9 in the State of Andhra Pradesh (km 160 to km 221.5) | Ministry of Road Transport and Highways | Andhra Pradesh | Transport and Logistics | Roads | 492.00 | 05.11.2007 | 13th PPPAC | Final approval |
235 | Four Laning of Jorabat-Barapani section from km. 0 to 61.800 of NH 40 in the state of Meghalaya under SARDP NE Phase A on BOT Annuity basis. | Ministry of Road Transport and Highways | Meghalaya | Transport and Logistics | Roads | 536.00 | 05.11.2007 | 13th PPPAC | Final approval |
236 | Six Laning of Pimpalgaon-Nashik-Gonde section of NH-3 in the State of Maharashtra under NHDP Phase IIIA on BOT basis. | Ministry of Road Transport and Highways | Maharashtra | Transport and Logistics | Roads | 752.47 | 05.11.2007 | 13th PPPAC | Final approval |
237 | Design Engineering, Construction, Development, Finance and Operation and maintenance of MP/Maharashtra Border Dhule section of NH 3 | Ministry of Road Transport and Highways | Maharashtra | Transport and Logistics | Roads | 675.00 | 05.11.2007 | 13th PPPAC | Final approval |
238 | Design, Engineering, Construction, Finance and Maintenance of Jaipur Reengus section of NH 11 | Ministry of Road Transport and Highways | Rajasthan | Transport and Logistics | Roads | 343.00 | 05.11.2007 | 13th PPPAC | Final approval |
239 | Six Laning of Surat-Dahisar Section of NH-8 (239 Km) in Gujarat and Maharashtra | Ministry of Road Transport and Highways | Maharashtra | Transport and Logistics | Roads | 1,405.57 | 11.05.2007 | 10th PPPAC | Final approval |
240 | Six Laning of Panipat - Jalandhar Section of NH-1 (291 Km) in Haryana and Punjab. | Ministry of Road Transport and Highways | Punjab | Transport and Logistics | Roads | 2,288.00 | 11.05.2007 | 10th PPPAC | Final approval |
241 | Six Laning of Chilkaluripet-Vijayawada, including Guntur bypass and Mangalagiri bypass of Chennai-Vijayawada Section of NH-5 in Andhra Pradesh. | Ministry of Road Transport and Highways | Andhra Pradesh | Transport and Logistics | Roads | 572.30 | 11.05.2007 | 10th PPPAC | Final approval |
242 | Six Laning of Chennai-Tada Section of NH-5 (43 Km) in Tamil Nadu | Ministry of Road Transport and Highways | Tamil Nadu | Transport and Logistics | Roads | 353.37 | 11.05.2007 | 10th PPPAC | Final approval |
243 | Six Laning of Gurgaon-Kotputli-Jaipur Section of NH-8 in Haryana/Rajasthan on BOT (Toll) basis following by DBFO pattern. | Ministry of Road Transport and Highways | Haryana | Transport and Logistics | Roads | 1,673.70 | 11.05.2007 | 10th PPPAC | Final approval |
244 | Six Laning of Vadakkancherry to Thrissur Section (Package No.NS-2/BOT/KL-3 | Ministry of Road Transport and Highways | Kerala | Transport and Logistics | Roads | 514.05 | 11.05.2007 | 10th PPPAC | Final approval |
245 | Four laning of Amritsar Wagha Boarder Section from Km.455.400 to Km 491.330 of NH-I in the State of Punjab on BOT basis. | Ministry of Road Transport and Highways | Punjab | Transport and Logistics | Roads | 205.88 | 16.01.2007 | 8th PPPAC | Final approval |
246 | Four Laning of Khalghat-MP/ Maharashtra Border section of NH-3 from Km. 84.700 to Km.167.500 in the state of M.P. on BOT basis. | Ministry of Road Transport and Highways | Madhya Pradesh | Transport and Logistics | Roads | 549.00 | 16.01.2007 | 8th PPPAC | Final approval |
247 | Construction of Elevated Six Lane Highway (Flyover) from Km.16,100 (In Delhi) to Km.20.500 (Haryana) and its approaches on NH-2 (Delhi Agra Section) on BOT basis. | Ministry of Road Transport and Highways | Uttar Pradesh | Transport and Logistics | Roads | 294.00 | 19.12.2006 | 6th PPPAC | Final approval |
248 | Construction of Access Controlled Highways from Km. 10/0 to Km. 29/5 of Bangolore section of NH-4 in the state of Karnataka on BOT basis | Ministry of Road Transport and Highways | Karnataka | Transport and Logistics | Roads | 380.00 | 01.11.2006 | 4th PPPAC | Final approval |
249 | Four Laning of Nelamangala Junction on NH-4 with NH-48 to Devihalli in the state of Karnataka under NHDP phase III A on BOT basis | Ministry of Road Transport and Highways | Karnataka | Transport and Logistics | Roads | 441.00 | 01.11.2006 | 4th PPPAC | Final approval |
250 | Widening of Existing Two Lane carriageway to Four/Six lane divided carriageway configuration of Bangalore -Hoskate - Mulbagal section of NH-4 in the state of Karnataka under NHDP phase III A on BOT basis | Ministry of Road Transport and Highways | Karnataka | Transport and Logistics | Roads | 565.00 | 01.11.2006 | 4th PPPAC | Final approval |
251 | Four Laning of Devilalli Hassan Section of NH- 48 in the state of Karnataka under NHDP phase III A on BOT basis | Ministry of Road Transport and Highways | Karnataka | Transport and Logistics | Roads | 440.00 | 01.11.2006 | 4th PPPAC | Final approval |
252 | Four Laning from Junction of NH-68 with NH-7 near Salem to Junction of NH-68 with NH-45 near Ulundrupet in the state of Tamil Nadu under NHDP Phase III A on BOT | Ministry of Road Transport and Highways | Tamil Nadu | Transport and Logistics | Roads | 941.00 | 01.11.2006 | 4th PPPAC | Final approval |
253 | Four Laning from Trichy city of NH-45 to Dindigul on NH-45 in the state of Tamil Nadu under NHDP Phase III A on BOT basis | Ministry of Road Transport and Highways | Tamil Nadu | Transport and Logistics | Roads | 576.00 | 01.11.2006 | 4th PPPAC | Final approval |
254 | Four Laning of Trichy city Junction with NH-45 B on NH-67 to Karur on NH-67 in the state of Tamil Nadu under NHDP Phase III A on BOT basis | Ministry of Road Transport and Highways | Tamil Nadu | Transport and Logistics | Roads | 516.00 | 01.11.2006 | 4th PPPAC | Final approval |
255 | Four Laning of Pondicherry to Tindivanam on NH-66 in the state of Tamil Nadu under NHDP Phase III A on BOT basis | Ministry of Road Transport and Highways | Tamil Nadu | Transport and Logistics | Roads | 285.00 | 01.11.2006 | 4th PPPAC | Final approval |
256 | Six/Four Laning of Zirakpur - Parwanoo section of NH-22 including Pinjore - Kalka - Parwanoo bypass in Punjab, Haryana and Himachal Pradesh under NHDP Phase III A | Ministry of Road Transport and Highways | Himachal Pradesh | Transport and Logistics | Roads | 295.00 | 01.11.2006 | 4th PPPAC | Final approval |
257 | Six/Four Laning of Delhi - Haryana Border to Rohtak Section of NH-10 from Km 29.70 to Km 87.00 including construction of Bahadurgarh and Rohtak Bypasses in Haryana under NHDP Phase IIIA | Ministry of Road Transport and Highways | Haryana | Transport and Logistics | Roads | 486.00 | 11.10.2006 | 3th PPPAC | Final approval |